EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA 1997

There is intersection along with road segment. The crossing point of the fourway traffic flow is called the intersection or roundabout. Traffic control at the roundabout intersection is the most critical and important in the overall movement of traffic on the road network in the city . The purpose o...

Full description

Saved in:
Bibliographic Details
Main Authors: , DEVI EKA SAPUTRA, , Suwardo, ST., MT., Ph.D.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/127293/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67542
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.127293
record_format dspace
spelling id-ugm-repo.1272932016-03-04T07:54:33Z https://repository.ugm.ac.id/127293/ EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA 1997 , DEVI EKA SAPUTRA , Suwardo, ST., MT., Ph.D. ETD There is intersection along with road segment. The crossing point of the fourway traffic flow is called the intersection or roundabout. Traffic control at the roundabout intersection is the most critical and important in the overall movement of traffic on the road network in the city . The purpose of this study was to determine capacity of the roundabout intersection area and to evaluate performance of roundabout. The standard used in this study is the standard Indonesian Highway Capacity Manual 1997. The experiment was conducted at the roundabout intersection of Gadjah Mada University. The tools used in survey include stationery, cameras, counter, meter, and stopwatch than Microsoft Excel as a tool to analyze the data. After in-depth analysis of the survey results on Monday shows the level of capacity ( C ) is 7804,316 pcu/hour to AB, the largest value of DS on Wednesday was 0,784 for weaving area DA, the highest number of total vehicle volume is 55504 and the average volume of 7401 veh/hour on the May 8, 2013 while the traffic delays that occur on May 8, 2013 was 16,044 sec/pcu and average delay - the average is 20.044 sec/pcu, the biggest queue for opportunities on May 8, 2013 is the weaving area DA that is 17 � 39 %. Thus obtained the performance of traffic flow on Wednesday, May 8, 2013 is more dense than the performance of the traffic flow on Monday, May 6, 2013. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , DEVI EKA SAPUTRA and , Suwardo, ST., MT., Ph.D. (2014) EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA 1997. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67542
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, DEVI EKA SAPUTRA
, Suwardo, ST., MT., Ph.D.
EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA 1997
description There is intersection along with road segment. The crossing point of the fourway traffic flow is called the intersection or roundabout. Traffic control at the roundabout intersection is the most critical and important in the overall movement of traffic on the road network in the city . The purpose of this study was to determine capacity of the roundabout intersection area and to evaluate performance of roundabout. The standard used in this study is the standard Indonesian Highway Capacity Manual 1997. The experiment was conducted at the roundabout intersection of Gadjah Mada University. The tools used in survey include stationery, cameras, counter, meter, and stopwatch than Microsoft Excel as a tool to analyze the data. After in-depth analysis of the survey results on Monday shows the level of capacity ( C ) is 7804,316 pcu/hour to AB, the largest value of DS on Wednesday was 0,784 for weaving area DA, the highest number of total vehicle volume is 55504 and the average volume of 7401 veh/hour on the May 8, 2013 while the traffic delays that occur on May 8, 2013 was 16,044 sec/pcu and average delay - the average is 20.044 sec/pcu, the biggest queue for opportunities on May 8, 2013 is the weaving area DA that is 17 � 39 %. Thus obtained the performance of traffic flow on Wednesday, May 8, 2013 is more dense than the performance of the traffic flow on Monday, May 6, 2013.
format Theses and Dissertations
NonPeerReviewed
author , DEVI EKA SAPUTRA
, Suwardo, ST., MT., Ph.D.
author_facet , DEVI EKA SAPUTRA
, Suwardo, ST., MT., Ph.D.
author_sort , DEVI EKA SAPUTRA
title EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA 1997
title_short EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA 1997
title_full EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA 1997
title_fullStr EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA 1997
title_full_unstemmed EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN INDONESIA 1997
title_sort evaluasi operasional simpang bundaran ugm yogyakarta berdasarkan manual kapasitas jalan indonesia 1997
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/127293/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67542
_version_ 1681232590092107776