PRARANCANGAN PABRIK GASIFIKASI BATUBARA KAPASITAS 400.000 TON/TAHUN

Most of the people of Indonesia used the energy that comes from fossil fuels for example oil, gas and coal. The low rank coal by gasification technology is one of the efforts to increase the use of coal to produce a product that is easily converted into a variety of energy sources and raw materials...

Full description

Saved in:
Bibliographic Details
Main Authors: , AGHNIA GRANITTIA BAKHRI, , Ir. Hary Sulistyo, SU., Ph.D.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/127431/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67683
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.127431
record_format dspace
spelling id-ugm-repo.1274312016-03-04T07:51:44Z https://repository.ugm.ac.id/127431/ PRARANCANGAN PABRIK GASIFIKASI BATUBARA KAPASITAS 400.000 TON/TAHUN , AGHNIA GRANITTIA BAKHRI , Ir. Hary Sulistyo, SU., Ph.D. ETD Most of the people of Indonesia used the energy that comes from fossil fuels for example oil, gas and coal. The low rank coal by gasification technology is one of the efforts to increase the use of coal to produce a product that is easily converted into a variety of energy sources and raw materials of chemical industry. Development opportunities of coal gasification industry in Indonesia is quite large. The plant is planned to operate for 330 days / year with a coal input capacity of 400.000 tons / year. The main raw material required is as much as 50.505 kg/hour of coal and 27.000 kg/hour of carbondioxide. The method used is the coal gasification. In general, syngas manufacturing stages process is as follows: (i) reaction between coal and carbondioxide with steam with reactor fluidized bed gasifier, (ii) separation of gas mixture and solid, (iii) syngas purification with absorber. As a support, utility plant unit supplies the cooling water as much as 2.941.088,26 kg / hour, 11.209,41 kVA electricity, compressed air up to 108 m 3 /hr, and 127.051,78 kg / hoursteam. The plant will be established in the city of Berau, East Kalimantan province, with consideration of raw material oriented. Berau region close to the coal industry. Plant location close to the river, so that the source of water for utility plant unit derived from river water. Calculation of economic evaluation results is fixed capital required equal to $36.773.844,54 + Rp 294.174.088.118,73 and working capital equal to $ 25.604.779,57 + Rp 33.143.004.393.263,39. At 100% production rate, obtained ROI before tax of 27,60 %, ROI after tax of 13,80 %, POT before tax of 2,66 years, POT after tax of 4,20 years, with BEP at 49,61 %, SDP at 27,69 %, and 26,5 % for DCFRR. Based on consideration of the economic evaluation results, this coal gasification plant with capacity 400.000 tons / year worth to be studied further. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , AGHNIA GRANITTIA BAKHRI and , Ir. Hary Sulistyo, SU., Ph.D. (2014) PRARANCANGAN PABRIK GASIFIKASI BATUBARA KAPASITAS 400.000 TON/TAHUN. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67683
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, AGHNIA GRANITTIA BAKHRI
, Ir. Hary Sulistyo, SU., Ph.D.
PRARANCANGAN PABRIK GASIFIKASI BATUBARA KAPASITAS 400.000 TON/TAHUN
description Most of the people of Indonesia used the energy that comes from fossil fuels for example oil, gas and coal. The low rank coal by gasification technology is one of the efforts to increase the use of coal to produce a product that is easily converted into a variety of energy sources and raw materials of chemical industry. Development opportunities of coal gasification industry in Indonesia is quite large. The plant is planned to operate for 330 days / year with a coal input capacity of 400.000 tons / year. The main raw material required is as much as 50.505 kg/hour of coal and 27.000 kg/hour of carbondioxide. The method used is the coal gasification. In general, syngas manufacturing stages process is as follows: (i) reaction between coal and carbondioxide with steam with reactor fluidized bed gasifier, (ii) separation of gas mixture and solid, (iii) syngas purification with absorber. As a support, utility plant unit supplies the cooling water as much as 2.941.088,26 kg / hour, 11.209,41 kVA electricity, compressed air up to 108 m 3 /hr, and 127.051,78 kg / hoursteam. The plant will be established in the city of Berau, East Kalimantan province, with consideration of raw material oriented. Berau region close to the coal industry. Plant location close to the river, so that the source of water for utility plant unit derived from river water. Calculation of economic evaluation results is fixed capital required equal to $36.773.844,54 + Rp 294.174.088.118,73 and working capital equal to $ 25.604.779,57 + Rp 33.143.004.393.263,39. At 100% production rate, obtained ROI before tax of 27,60 %, ROI after tax of 13,80 %, POT before tax of 2,66 years, POT after tax of 4,20 years, with BEP at 49,61 %, SDP at 27,69 %, and 26,5 % for DCFRR. Based on consideration of the economic evaluation results, this coal gasification plant with capacity 400.000 tons / year worth to be studied further.
format Theses and Dissertations
NonPeerReviewed
author , AGHNIA GRANITTIA BAKHRI
, Ir. Hary Sulistyo, SU., Ph.D.
author_facet , AGHNIA GRANITTIA BAKHRI
, Ir. Hary Sulistyo, SU., Ph.D.
author_sort , AGHNIA GRANITTIA BAKHRI
title PRARANCANGAN PABRIK GASIFIKASI BATUBARA KAPASITAS 400.000 TON/TAHUN
title_short PRARANCANGAN PABRIK GASIFIKASI BATUBARA KAPASITAS 400.000 TON/TAHUN
title_full PRARANCANGAN PABRIK GASIFIKASI BATUBARA KAPASITAS 400.000 TON/TAHUN
title_fullStr PRARANCANGAN PABRIK GASIFIKASI BATUBARA KAPASITAS 400.000 TON/TAHUN
title_full_unstemmed PRARANCANGAN PABRIK GASIFIKASI BATUBARA KAPASITAS 400.000 TON/TAHUN
title_sort prarancangan pabrik gasifikasi batubara kapasitas 400.000 ton/tahun
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2014
url https://repository.ugm.ac.id/127431/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67683
_version_ 1681232614747275264