KAJIAN DOKUMEN INSTRUKSI KERJA DAN PENERAPANNYA DI LAPANGAN (STUDI KASUS PADA PROYEK PEMBANGUNAN JEMBATAN IRONAYAN)
completed within A project generally has the goal to be the right cost, right quality, on time and done safely. One attempt to reach the project goal is by doing each job with work instructions so that work can be done efficiently and effectively. The Regulation of the Minister of Public Works No. 0...
Saved in:
Main Authors: | , MOCH. AFAN ASADI, , Toriq A. Ghuzdewan, S.T., MSCE |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/127551/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67812 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
ANALISIS PROGRES PEKERJAAN MULTI-PROYEK:
Studi Kasus Pada Proyek Pembangunan Rumah Massal Perumahan Hyarta Residence
by: , SAGARASENJA KARTIKA PUTRA, et al.
Published: (2014) -
KAJIAN TEKNIS DAN ANALISA HARGA SATUAN PEKERJAAN AKTUAL PEMASANGAN UNIT PRACETAK GELAGAR TIPE I BENTANG 40 METER Studi Kasus Proyek Peningkatan Jembatan Ironayan
by: , YOGI HANINDITO, et al.
Published: (2014) -
METODOLOGI PEMBANGUNGAN ABUTMENT JEMBATAN PROYEK PEMBANGUNAN JEMBATAN DOUBLE TRACK KERETA CIREBON-KROYA
by: , AHMAD FUAD HABIBI, et al.
Published: (2013) -
Analisis sistem jaringan kerja pada proyek pembangunan jembatan
by: , SARANGA, Hary Lebang, et al.
Published: (2001) -
Evaluasi dokumen-dokumen perencanaan pembangunan daerah Kabupaten Buru, 2002-2006
by: , PULHEHE, Fatum, et al.
Published: (2007)