RANCANGAN MACHINERY FAILURE MODE AND EFFECT ANALYSIS PADA AUTOMATIC SPRAY MACHINE STUDI PADA PT ABC
In 2012, machine breakdown happened for proceeding painting process at Painting#1 area of PT.ABC was 4.053 minutes, while Key Performance Indicator set up by Top Management as standard for machine breakdown is only 2.268 minutes in maximum. Based on analysis, 65,08% machine breakdown was caused by t...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/133531/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=74231 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |