RANCANGAN MACHINERY FAILURE MODE AND EFFECT ANALYSIS PADA AUTOMATIC SPRAY MACHINE STUDI PADA PT ABC

In 2012, machine breakdown happened for proceeding painting process at Painting#1 area of PT.ABC was 4.053 minutes, while Key Performance Indicator set up by Top Management as standard for machine breakdown is only 2.268 minutes in maximum. Based on analysis, 65,08% machine breakdown was caused by t...

Full description

Saved in:
Bibliographic Details
Main Authors: , Levino Mariano, , Wakhid Slamet Ciptono, PhD, MBA, MPM
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/133531/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=74231
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
Description
Summary:In 2012, machine breakdown happened for proceeding painting process at Painting#1 area of PT.ABC was 4.053 minutes, while Key Performance Indicator set up by Top Management as standard for machine breakdown is only 2.268 minutes in maximum. Based on analysis, 65,08% machine breakdown was caused by the weakness of machine preventive maintenance, therefore to achieve KPI standard in 2013, the usual method of machine preventive maintenance need to be improved, and Automatic Spray Machine has been chosen as the pilot project. PT. ABC always develops their machine�s preventive maintenance method by using Root Cause Analysis whenever machine breakdown occurred. Nevertheless, machine breakdowns still occur frequently. Therefore, nowadays this study has used Failure Mode and Effect Analysis method as a proactive action to overcome the shortage of Root Cause Analysis method. Result of the Failure Mode and Effect Analysis design implemented on Automatic Spray Machine, the machine breakdown risk is classified very big, reaches until 5.819,71 minutes. From this total risk, 2.552,65 minutes were being identified as major risks that are unknown to occur. Magnitude of the risk were due to the low effectiveness of preventive maintenance method, with averaging detection is 7,2. By improving the preventive maintenance method, the machine breakdown risk could be eliminate to 84,30%. Despite the improvement in preventive maintenance methods, the Key Performance Indicator of machine breakdown in 2013 still could not be achieved, hence improvement in the design of Automatic Spray Machine will also be needed to further eliminate the risks caused by the occurrence and severity factors.