Pemanenan kayu dengan sistem forwarder gang*) di hphti PT Rapp Riau

The purpose of this research was to find out the harvested timber crops using Forwarder Gang System on clear cutting forest stand. its tools composition in the system and economically to obtain the cost per m3 . The cost was calculated based on the actual, it compared to the planned production. Harv...

Full description

Saved in:
Bibliographic Details
Main Author: Perpustakaan UGM, i-lib
Format: Article NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 1998
Subjects:
Online Access:https://repository.ugm.ac.id/21669/
http://i-lib.ugm.ac.id/jurnal/download.php?dataId=4538
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.21669
record_format dspace
spelling id-ugm-repo.216692014-06-18T00:37:14Z https://repository.ugm.ac.id/21669/ Pemanenan kayu dengan sistem forwarder gang*) di hphti PT Rapp Riau Perpustakaan UGM, i-lib Jurnal i-lib UGM The purpose of this research was to find out the harvested timber crops using Forwarder Gang System on clear cutting forest stand. its tools composition in the system and economically to obtain the cost per m3 . The cost was calculated based on the actual, it compared to the planned production. Harvesting timber by using Forwarder Gang method was started by_ felling trees and finished by loading operation. The operation was observed in RAAP area, Riau. The natural forest was harvested by clear cutting system and then converted into HT1 plantation. The data was collected during July to August 1997. The result showed that the tools composition were : 15 chainsaws for cutting, 1 forwarder and 1 skidder for forwarding and skidding, and 2 excavators for prebunching and loading. The total cost of forwarder gang for 210 m3 per day for the actual production was US$ 9.698 per m3, while the total cost of forwarder gang for 390 m3 per day for the planned production was US$ 6.286 per m3. Key words : forwarder gang, skidder, excavator, clear cut [Yogyakarta] : Universitas Gadjah Mada 1998 Article NonPeerReviewed Perpustakaan UGM, i-lib (1998) Pemanenan kayu dengan sistem forwarder gang*) di hphti PT Rapp Riau. Jurnal i-lib UGM. http://i-lib.ugm.ac.id/jurnal/download.php?dataId=4538
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic Jurnal i-lib UGM
spellingShingle Jurnal i-lib UGM
Perpustakaan UGM, i-lib
Pemanenan kayu dengan sistem forwarder gang*) di hphti PT Rapp Riau
description The purpose of this research was to find out the harvested timber crops using Forwarder Gang System on clear cutting forest stand. its tools composition in the system and economically to obtain the cost per m3 . The cost was calculated based on the actual, it compared to the planned production. Harvesting timber by using Forwarder Gang method was started by_ felling trees and finished by loading operation. The operation was observed in RAAP area, Riau. The natural forest was harvested by clear cutting system and then converted into HT1 plantation. The data was collected during July to August 1997. The result showed that the tools composition were : 15 chainsaws for cutting, 1 forwarder and 1 skidder for forwarding and skidding, and 2 excavators for prebunching and loading. The total cost of forwarder gang for 210 m3 per day for the actual production was US$ 9.698 per m3, while the total cost of forwarder gang for 390 m3 per day for the planned production was US$ 6.286 per m3. Key words : forwarder gang, skidder, excavator, clear cut
format Article
NonPeerReviewed
author Perpustakaan UGM, i-lib
author_facet Perpustakaan UGM, i-lib
author_sort Perpustakaan UGM, i-lib
title Pemanenan kayu dengan sistem forwarder gang*) di hphti PT Rapp Riau
title_short Pemanenan kayu dengan sistem forwarder gang*) di hphti PT Rapp Riau
title_full Pemanenan kayu dengan sistem forwarder gang*) di hphti PT Rapp Riau
title_fullStr Pemanenan kayu dengan sistem forwarder gang*) di hphti PT Rapp Riau
title_full_unstemmed Pemanenan kayu dengan sistem forwarder gang*) di hphti PT Rapp Riau
title_sort pemanenan kayu dengan sistem forwarder gang*) di hphti pt rapp riau
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 1998
url https://repository.ugm.ac.id/21669/
http://i-lib.ugm.ac.id/jurnal/download.php?dataId=4538
_version_ 1681217877431025664