Analisis Makespan Job shop Menggunakan Metode Active, Non-Delay dan Heuristic Generation
This paper reports a proposed solution to the problem that commonly exists in the Job Shop industry which apply MOT system with varying type of repetitive product. Three algorithm scheduling methods have been used to look at a make span during production process i.e. Active Generation (AG), Non Dela...
Saved in:
Main Author: | Perpustakaan UGM, i-lib |
---|---|
Format: | Article NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2009
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/27462/ http://i-lib.ugm.ac.id/jurnal/download.php?dataId=10521 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
A scheduling heuristic for simultaneous minimization of makespan and total weighted tardiness in the open shop setup
by: Siy, Eric A.
Published: (1999) -
Comparison of predicted delay to observed delay
by: Perpustakaan UGM, i-lib
Published: (1990) -
Prospek Terapi Kanker Menggunakan Metode BNCT
by: Perpustakaan UGM, i-lib
Published: (2004) -
A New Job Priority Rule for the NEH-based heuristic to Minimize Makespan in Permutation Flowshops
by: Jiang-Hua Zhang, et al.
Published: (2023) -
Penentuan Daya Tetas Dengan Menggunakan Metode Gravitasi
by: Perpustakaan UGM, i-lib
Published: (1994)