Network distribution system 20 kV at Gardu Induk (GI) Ciamis use over current relay (OCR) to protect short circuit between phase to phase and threephase, mean while ground fault relay (DGR) for disturbing phase to the ground at the main feeder and fuse or fuse cut out at branch of feeder. To day, ne...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2011
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/88351/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=50440 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Summary: | Network distribution system 20 kV at Gardu Induk (GI) Ciamis use over
current relay (OCR) to protect short circuit between phase to phase and threephase,
mean while ground fault relay (DGR) for disturbing phase to the ground at
the main feeder and fuse or fuse cut out at branch of feeder. To day, network
condition (2009) is very different from before when it operated so, need
evaluation to load current and short circuit at last condition, especially at feeder
Kawali 4.
Based on the last condition, if done the great recalculation short circuit at
many points, at feeder Kawali 4 to get new setting for over current relay (OCR) at
basic of feeder and the calculation above done manually.
According to coordination of analyzed result that all fuses lighted
(rating 15 T, 20 T, 30 T, 40 T dan 50 T) still need enough load and in good
coordination. Setting of over current relay (OCR) at basic of feeder need
appropriated with new load. With current setting 400 A, especially for standard
inverse (SI), time multiplier setting (TMS) = 0,1 second, enough coordination