EVALUASI SISTEM PROTEKSI ARUS LEBIH JARINGAN 20 KV DI GARDU INDUK CIAMIS

Network distribution system 20 kV at Gardu Induk (GI) Ciamis use over current relay (OCR) to protect short circuit between phase to phase and threephase, mean while ground fault relay (DGR) for disturbing phase to the ground at the main feeder and fuse or fuse cut out at branch of feeder. To day, ne...

Full description

Saved in:
Bibliographic Details
Main Authors: , Faizal Iswara, ST, , Ir. I Nengah Sumerti
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2011
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/88351/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=50440
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.88351
record_format dspace
spelling id-ugm-repo.883512014-08-20T02:51:26Z https://repository.ugm.ac.id/88351/ EVALUASI SISTEM PROTEKSI ARUS LEBIH JARINGAN 20 KV DI GARDU INDUK CIAMIS , Faizal Iswara, ST , Ir. I Nengah Sumerti ETD Network distribution system 20 kV at Gardu Induk (GI) Ciamis use over current relay (OCR) to protect short circuit between phase to phase and threephase, mean while ground fault relay (DGR) for disturbing phase to the ground at the main feeder and fuse or fuse cut out at branch of feeder. To day, network condition (2009) is very different from before when it operated so, need evaluation to load current and short circuit at last condition, especially at feeder Kawali 4. Based on the last condition, if done the great recalculation short circuit at many points, at feeder Kawali 4 to get new setting for over current relay (OCR) at basic of feeder and the calculation above done manually. According to coordination of analyzed result that all fuses lighted (rating 15 T, 20 T, 30 T, 40 T dan 50 T) still need enough load and in good coordination. Setting of over current relay (OCR) at basic of feeder need appropriated with new load. With current setting 400 A, especially for standard inverse (SI), time multiplier setting (TMS) = 0,1 second, enough coordination result with the fuse at branches of feeder. [Yogyakarta] : Universitas Gadjah Mada 2011 Thesis NonPeerReviewed , Faizal Iswara, ST and , Ir. I Nengah Sumerti (2011) EVALUASI SISTEM PROTEKSI ARUS LEBIH JARINGAN 20 KV DI GARDU INDUK CIAMIS. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=50440
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, Faizal Iswara, ST
, Ir. I Nengah Sumerti
EVALUASI SISTEM PROTEKSI ARUS LEBIH JARINGAN 20 KV DI GARDU INDUK CIAMIS
description Network distribution system 20 kV at Gardu Induk (GI) Ciamis use over current relay (OCR) to protect short circuit between phase to phase and threephase, mean while ground fault relay (DGR) for disturbing phase to the ground at the main feeder and fuse or fuse cut out at branch of feeder. To day, network condition (2009) is very different from before when it operated so, need evaluation to load current and short circuit at last condition, especially at feeder Kawali 4. Based on the last condition, if done the great recalculation short circuit at many points, at feeder Kawali 4 to get new setting for over current relay (OCR) at basic of feeder and the calculation above done manually. According to coordination of analyzed result that all fuses lighted (rating 15 T, 20 T, 30 T, 40 T dan 50 T) still need enough load and in good coordination. Setting of over current relay (OCR) at basic of feeder need appropriated with new load. With current setting 400 A, especially for standard inverse (SI), time multiplier setting (TMS) = 0,1 second, enough coordination result with the fuse at branches of feeder.
format Theses and Dissertations
NonPeerReviewed
author , Faizal Iswara, ST
, Ir. I Nengah Sumerti
author_facet , Faizal Iswara, ST
, Ir. I Nengah Sumerti
author_sort , Faizal Iswara, ST
title EVALUASI SISTEM PROTEKSI ARUS LEBIH JARINGAN 20 KV DI GARDU INDUK CIAMIS
title_short EVALUASI SISTEM PROTEKSI ARUS LEBIH JARINGAN 20 KV DI GARDU INDUK CIAMIS
title_full EVALUASI SISTEM PROTEKSI ARUS LEBIH JARINGAN 20 KV DI GARDU INDUK CIAMIS
title_fullStr EVALUASI SISTEM PROTEKSI ARUS LEBIH JARINGAN 20 KV DI GARDU INDUK CIAMIS
title_full_unstemmed EVALUASI SISTEM PROTEKSI ARUS LEBIH JARINGAN 20 KV DI GARDU INDUK CIAMIS
title_sort evaluasi sistem proteksi arus lebih jaringan 20 kv di gardu induk ciamis
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2011
url https://repository.ugm.ac.id/88351/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=50440
_version_ 1681228571626962944