PENGEMBANGAN SISTEM PLTNH PADA SALURAN IRIGASI INDUKGUNG (TEST TEDI ) SUNGAI GUNG TEGAL
Tegal Regency Consists of 18 Sub districts, 287 villages, and 1.499.167 populations (2010). From the population above, most of them are located in village area which is spread in all sub districts. Topography in Tegal is 87.879 Ha or 878,79 Km 2 with declivity land between 0% until 40%. Based on dis...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2011
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/90466/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=52264 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.90466 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.904662014-08-20T02:51:07Z https://repository.ugm.ac.id/90466/ PENGEMBANGAN SISTEM PLTNH PADA SALURAN IRIGASI INDUKGUNG (TEST TEDI ) SUNGAI GUNG TEGAL , Drs.Koeswantoro , Dr. Ing. Ir. Agus Maryono ETD Tegal Regency Consists of 18 Sub districts, 287 villages, and 1.499.167 populations (2010). From the population above, most of them are located in village area which is spread in all sub districts. Topography in Tegal is 87.879 Ha or 878,79 Km 2 with declivity land between 0% until 40%. Based on discharge in river and irrigation channel its head, it estimated that there is microhydro potential can be generated as an alternative solution of electricity problem. This researchis aimed to analyze river and irrigation channel potential for PLTMh, plan the crossflow turbine, and design potential located of PLTMh which is chosen (Baturgedong-Danawarih). To determine the microhydro, the research has been done toward discharge river data, rainfall, topography map, administration map. Primary data collected by direct measuring in the area, like irrigation channel discharge and head. The research result of water energy potential in Tegal Regency is obtained 1012 KW electricity power in 9 potenial points from irrigation cannel and 539,495 KW from 12 potenial points in the river. Its total is 1.551,553 KW, Economy analysis result indicates investment cost which is needed by development of microhydro power plant (PLTMH) system at�gung� primary irrigation channel Baturgedong is Rp.824.000.242,00- with Benefit Cost Ratio ( BCR ) = 1,87. The construction result of crossflow turbine which diameter 88 mm, for head = 3,4 m and Q = 5 lt /s, the result of efficiency is 59 % . [Yogyakarta] : Universitas Gadjah Mada 2011 Thesis NonPeerReviewed , Drs.Koeswantoro and , Dr. Ing. Ir. Agus Maryono (2011) PENGEMBANGAN SISTEM PLTNH PADA SALURAN IRIGASI INDUKGUNG (TEST TEDI ) SUNGAI GUNG TEGAL. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=52264 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , Drs.Koeswantoro , Dr. Ing. Ir. Agus Maryono PENGEMBANGAN SISTEM PLTNH PADA SALURAN IRIGASI INDUKGUNG (TEST TEDI ) SUNGAI GUNG TEGAL |
description |
Tegal Regency Consists of 18 Sub districts, 287 villages, and 1.499.167
populations (2010). From the population above, most of them are located in
village area which is spread in all sub districts. Topography in Tegal is 87.879 Ha
or 878,79 Km
2
with declivity land between 0% until 40%. Based on discharge
in river and irrigation channel its head, it estimated that there is microhydro
potential can be generated as an alternative solution of electricity problem. This
researchis aimed to analyze river and irrigation channel potential for PLTMh, plan
the crossflow turbine, and design potential located of PLTMh which is chosen
(Baturgedong-Danawarih).
To determine the microhydro, the research has been done toward discharge
river data, rainfall, topography map, administration map. Primary data collected
by direct measuring in the area, like irrigation channel discharge and head.
The research result of water energy potential in Tegal Regency is obtained
1012 KW electricity power in 9 potenial points from irrigation cannel and
539,495 KW from 12 potenial points in the river. Its total is 1.551,553 KW,
Economy analysis result indicates investment cost which is needed by
development of microhydro power plant (PLTMH) system at�gung� primary
irrigation channel Baturgedong is Rp.824.000.242,00- with Benefit Cost Ratio (
BCR ) = 1,87. The construction result of crossflow turbine which diameter 88
mm, for head = 3,4 m and Q = 5 lt /s, the result of efficiency is 59 % . |
format |
Theses and Dissertations NonPeerReviewed |
author |
, Drs.Koeswantoro , Dr. Ing. Ir. Agus Maryono |
author_facet |
, Drs.Koeswantoro , Dr. Ing. Ir. Agus Maryono |
author_sort |
, Drs.Koeswantoro |
title |
PENGEMBANGAN SISTEM PLTNH PADA SALURAN IRIGASI INDUKGUNG (TEST TEDI ) SUNGAI GUNG TEGAL |
title_short |
PENGEMBANGAN SISTEM PLTNH PADA SALURAN IRIGASI INDUKGUNG (TEST TEDI ) SUNGAI GUNG TEGAL |
title_full |
PENGEMBANGAN SISTEM PLTNH PADA SALURAN IRIGASI INDUKGUNG (TEST TEDI ) SUNGAI GUNG TEGAL |
title_fullStr |
PENGEMBANGAN SISTEM PLTNH PADA SALURAN IRIGASI INDUKGUNG (TEST TEDI ) SUNGAI GUNG TEGAL |
title_full_unstemmed |
PENGEMBANGAN SISTEM PLTNH PADA SALURAN IRIGASI INDUKGUNG (TEST TEDI ) SUNGAI GUNG TEGAL |
title_sort |
pengembangan sistem pltnh pada saluran irigasi indukgung (test tedi ) sungai gung tegal |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2011 |
url |
https://repository.ugm.ac.id/90466/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=52264 |
_version_ |
1681228970056482816 |