PERENCANAAN, PEMBANGUNAN DAN PENGEMBANGAN PEMANFAATAN SISTEM PEMBANGKIT LISTRIK TENAGA PIKOHIDRO DENGAN STUDI KARAKTERISTIK DAN DESAIN ULANG SUDU TURBIN OPEN FLUME DI DUSUN WANARATA DESA GUMELEM KULON KECAMATAN SUSUKAN KABUPATEN BANJARNEGARA

Banjarnegara is known as the national electric energy supplier with �Jendral Soedirman� hydropower plant. This plant produces 181.5 MW which supplies 5% or 90 MW of 120 GW for Java-Bali. Data of PSDA & ESDM Department stated that the electrification ratio in 2011 is only 64.70%. In Banjarneg...

Full description

Saved in:
Bibliographic Details
Main Authors: , ARIF SUGIANTO, , Dr.-Ing. Ir. Agus Maryono
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2012
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/99987/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=56235
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
Be the first to leave a comment!
You must be logged in first