The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.]

Industrialised Building System (IBS) is defined as method for thorough integration of subsystems, components, and parts into a single overall system that utilizes industrialised manufacturing, transportation, assembling, and erection on site. Buildings that are built by using IBS method have many be...

Full description

Saved in:
Bibliographic Details
Main Authors: Samsi, Muhammad Syafiq Bahrin, Zainuddin, Mohd Firdaus, Yop Zain, Fairiz Miza, Saidin, Mohamad Tajudin, Mamat, Mohd Esham, Zainal Abidin, Zaiwanizar
Format: Article
Language:English
Published: Universiti Teknologi MARA, Perak 2024
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/98856/1/98856.pdf
https://ir.uitm.edu.my/id/eprint/98856/
https://journal.uitm.edu.my/ojs/index.php/MySE/issue/view/62
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.98856
record_format eprints
spelling my.uitm.ir.988562024-09-18T18:33:56Z https://ir.uitm.edu.my/id/eprint/98856/ The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.] myse Samsi, Muhammad Syafiq Bahrin Zainuddin, Mohd Firdaus Yop Zain, Fairiz Miza Saidin, Mohamad Tajudin Mamat, Mohd Esham Zainal Abidin, Zaiwanizar NA Architecture Architectural drawing and design Industrialised Building System (IBS) is defined as method for thorough integration of subsystems, components, and parts into a single overall system that utilizes industrialised manufacturing, transportation, assembling, and erection on site. Buildings that are built by using IBS method have many benefits, including high quality, low cost, fast construction, high flexibility, minimal wastage, and less environmental impact. However, adopting IBS in Sarawak has several hindrances such as logistical situation in rural Sarawak and the overpriced IBS adoption due to lack of manufacturer in the areas which causes lack of readiness among contractors. Thus, the aim of this research is to identify the G7 contractors’ readiness and investigate the challenges of IBS adoption for construction in Sarawak. One hundred and twenty-five sets of questionnaire surveys were distributed to G7 contractors in Kuching area by using google form as online medium and were analysed using SPSS version 26 software. The findings from the survey showed that Sarawak G7 contractors still lack readiness in IBS adoption due to challenges faced. Thus, further research needed on steps to be taken to reduce challenges in adopting IBS in Sarawak. Universiti Teknologi MARA, Perak 2024-03 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/98856/1/98856.pdf The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.]. (2024) Malaysian Journal of Sustainable Environment (MySE) <https://ir.uitm.edu.my/view/publication/Malaysian_Journal_of_Sustainable_Environment_=28MySE=29/>, 11 (1). pp. 25-44. ISSN 0128-326X https://journal.uitm.edu.my/ojs/index.php/MySE/issue/view/62 10.24191/myse.v11i1.985 10.24191/myse.v11i1.985 10.24191/myse.v11i1.985
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic NA Architecture
Architectural drawing and design
spellingShingle NA Architecture
Architectural drawing and design
Samsi, Muhammad Syafiq Bahrin
Zainuddin, Mohd Firdaus
Yop Zain, Fairiz Miza
Saidin, Mohamad Tajudin
Mamat, Mohd Esham
Zainal Abidin, Zaiwanizar
The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.]
description Industrialised Building System (IBS) is defined as method for thorough integration of subsystems, components, and parts into a single overall system that utilizes industrialised manufacturing, transportation, assembling, and erection on site. Buildings that are built by using IBS method have many benefits, including high quality, low cost, fast construction, high flexibility, minimal wastage, and less environmental impact. However, adopting IBS in Sarawak has several hindrances such as logistical situation in rural Sarawak and the overpriced IBS adoption due to lack of manufacturer in the areas which causes lack of readiness among contractors. Thus, the aim of this research is to identify the G7 contractors’ readiness and investigate the challenges of IBS adoption for construction in Sarawak. One hundred and twenty-five sets of questionnaire surveys were distributed to G7 contractors in Kuching area by using google form as online medium and were analysed using SPSS version 26 software. The findings from the survey showed that Sarawak G7 contractors still lack readiness in IBS adoption due to challenges faced. Thus, further research needed on steps to be taken to reduce challenges in adopting IBS in Sarawak.
format Article
author Samsi, Muhammad Syafiq Bahrin
Zainuddin, Mohd Firdaus
Yop Zain, Fairiz Miza
Saidin, Mohamad Tajudin
Mamat, Mohd Esham
Zainal Abidin, Zaiwanizar
author_facet Samsi, Muhammad Syafiq Bahrin
Zainuddin, Mohd Firdaus
Yop Zain, Fairiz Miza
Saidin, Mohamad Tajudin
Mamat, Mohd Esham
Zainal Abidin, Zaiwanizar
author_sort Samsi, Muhammad Syafiq Bahrin
title The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.]
title_short The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.]
title_full The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.]
title_fullStr The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.]
title_full_unstemmed The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.]
title_sort readiness and challenges in the industrialised building system (ibs) adoption in sarawak from g7 contractors’ perspective/ muhammad syafiq bahrin samsi ... [et al.]
publisher Universiti Teknologi MARA, Perak
publishDate 2024
url https://ir.uitm.edu.my/id/eprint/98856/1/98856.pdf
https://ir.uitm.edu.my/id/eprint/98856/
https://journal.uitm.edu.my/ojs/index.php/MySE/issue/view/62
_version_ 1811598103532273664