The readiness and challenges in the Industrialised Building System (IBS) adoption in Sarawak from G7 contractors’ perspective/ Muhammad Syafiq Bahrin Samsi ... [et al.]

Industrialised Building System (IBS) is defined as method for thorough integration of subsystems, components, and parts into a single overall system that utilizes industrialised manufacturing, transportation, assembling, and erection on site. Buildings that are built by using IBS method have many be...

Full description

Saved in:
Bibliographic Details
Main Authors: Samsi, Muhammad Syafiq Bahrin, Zainuddin, Mohd Firdaus, Yop Zain, Fairiz Miza, Saidin, Mohamad Tajudin, Mamat, Mohd Esham, Zainal Abidin, Zaiwanizar
Format: Article
Language:English
Published: Universiti Teknologi MARA, Perak 2024
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/98856/1/98856.pdf
https://ir.uitm.edu.my/id/eprint/98856/
https://journal.uitm.edu.my/ojs/index.php/MySE/issue/view/62
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English

Similar Items