Scheduling Analysis for Job Sequencing in Veneer Lamination Line

The objective of this project is to reduce the numbers of work-in-process (WIP) at veneer lamination line One of the problems that been identified and formulated was poor production planning and scheduling at the veneer lamination line. Scheduling analysis of priority rules to overcome the poor plan...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohamad Zairi, Baharom, Wan Nazdah, Wan Hussin
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/7334/1/Scheduling_Analysis_for_Job_Sequencing_in_Veneer_Lamination_Line.pdf
http://umpir.ump.edu.my/id/eprint/7334/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English