Scheduling Analysis for Job Sequencing in Veneer Lamination Line
The objective of this project is to reduce the numbers of work-in-process (WIP) at veneer lamination line One of the problems that been identified and formulated was poor production planning and scheduling at the veneer lamination line. Scheduling analysis of priority rules to overcome the poor plan...
Saved in:
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/7334/1/Scheduling_Analysis_for_Job_Sequencing_in_Veneer_Lamination_Line.pdf http://umpir.ump.edu.my/id/eprint/7334/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Pahang |
Language: | English |
id |
my.ump.umpir.7334 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.73342018-03-01T08:07:09Z http://umpir.ump.edu.my/id/eprint/7334/ Scheduling Analysis for Job Sequencing in Veneer Lamination Line Mohamad Zairi, Baharom Wan Nazdah, Wan Hussin TJ Mechanical engineering and machinery The objective of this project is to reduce the numbers of work-in-process (WIP) at veneer lamination line One of the problems that been identified and formulated was poor production planning and scheduling at the veneer lamination line. Scheduling analysis of priority rules to overcome the poor planning and scheduling problem by comparing the existing rules of sequencing jobs by using earliest due date (EDD) method with other three priority rules which are first come first serve (FCFS), shortest processing time (SPT) and longest processing time (LPT) been approached to the system to be analyze. Average Job Delayed (AJD) has been used as the measures of effectiveness. New sequencing jobs rule of SPT instead of EPT which is currently used has been proposed and managed to reduce the number of WIP board from 1500 pieces to only 80 pieces. 2014 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/7334/1/Scheduling_Analysis_for_Job_Sequencing_in_Veneer_Lamination_Line.pdf Mohamad Zairi, Baharom and Wan Nazdah, Wan Hussin (2014) Scheduling Analysis for Job Sequencing in Veneer Lamination Line. In: International Conference on Information Management and Industrial Engineering (ICII 2014), 22-23 August 2014 , Dubai. . (Unpublished) |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Mohamad Zairi, Baharom Wan Nazdah, Wan Hussin Scheduling Analysis for Job Sequencing in Veneer Lamination Line |
description |
The objective of this project is to reduce the numbers of work-in-process (WIP) at veneer lamination line One of the problems that been identified and formulated was poor production planning and scheduling at the veneer lamination line. Scheduling analysis of priority rules to overcome the poor planning and scheduling problem by comparing the existing rules of sequencing jobs by using earliest due date (EDD) method with other three priority rules which are first come first serve (FCFS), shortest processing time (SPT) and longest processing time (LPT) been approached to the system to be analyze. Average Job Delayed (AJD) has been used as the measures of effectiveness. New sequencing jobs rule of SPT instead of EPT which is currently used has been proposed and managed to reduce the number of WIP board from 1500 pieces to only 80 pieces. |
format |
Conference or Workshop Item |
author |
Mohamad Zairi, Baharom Wan Nazdah, Wan Hussin |
author_facet |
Mohamad Zairi, Baharom Wan Nazdah, Wan Hussin |
author_sort |
Mohamad Zairi, Baharom |
title |
Scheduling Analysis for Job Sequencing in Veneer Lamination Line |
title_short |
Scheduling Analysis for Job Sequencing in Veneer Lamination Line |
title_full |
Scheduling Analysis for Job Sequencing in Veneer Lamination Line |
title_fullStr |
Scheduling Analysis for Job Sequencing in Veneer Lamination Line |
title_full_unstemmed |
Scheduling Analysis for Job Sequencing in Veneer Lamination Line |
title_sort |
scheduling analysis for job sequencing in veneer lamination line |
publishDate |
2014 |
url |
http://umpir.ump.edu.my/id/eprint/7334/1/Scheduling_Analysis_for_Job_Sequencing_in_Veneer_Lamination_Line.pdf http://umpir.ump.edu.my/id/eprint/7334/ |
_version_ |
1643665605815959552 |