Factors that affect the performance of public project in Malaysia

Public project is covers most of the infrastructure and facilities needs such as schools, hospitals, administration offices, religious buildings and many more. This paper based on study that has been conducted which involves types of public project and problems of handling public project. This study...

Full description

Saved in:
Bibliographic Details
Main Author: Norsyahidatul Nazirah , Ismail
Format: Undergraduates Project Papers
Language:English
Published: 2012
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/7884/1/NORSYAHIDATUL_NAZIRAH_BINTI_ISMAIL.PDF
http://umpir.ump.edu.my/id/eprint/7884/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
id my.ump.umpir.7884
record_format eprints
spelling my.ump.umpir.78842021-06-10T04:32:15Z http://umpir.ump.edu.my/id/eprint/7884/ Factors that affect the performance of public project in Malaysia Norsyahidatul Nazirah , Ismail TH Building construction Public project is covers most of the infrastructure and facilities needs such as schools, hospitals, administration offices, religious buildings and many more. This paper based on study that has been conducted which involves types of public project and problems of handling public project. This study also focused on factors that affect the performance of public project in Malaysia. To achieve the objective of this study, 140 sets of questionnaire have been sending to twenty (20) companies and eight (8) Jabatan Kerja Raya (JKR) main branches around Malaysia. Average Index (AT) method have been use to analyze data that has been collected. It was found that, there are eleven (11) types of public project and the highest occurrence is public facilities project. Nevertheless, there are twelve (12) problems of handling public project in Malaysia and the highest frequency of occurrence is social issues. There are four factors that affect the performance of public project in Malaysia which are cost, time, quality and safety and health and the critical factor that affects the performance of public project is cost. Future study can be done about how to control the problems of handling public project in Malaysia which is can affect the performance of public project, how these four (4) factors which are cost, time, quality, and safety and health will affect the performance of public project, and how to control the factors that affect the performance of public project. 2012-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/7884/1/NORSYAHIDATUL_NAZIRAH_BINTI_ISMAIL.PDF Norsyahidatul Nazirah , Ismail (2012) Factors that affect the performance of public project in Malaysia. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Norsyahidatul Nazirah , Ismail
Factors that affect the performance of public project in Malaysia
description Public project is covers most of the infrastructure and facilities needs such as schools, hospitals, administration offices, religious buildings and many more. This paper based on study that has been conducted which involves types of public project and problems of handling public project. This study also focused on factors that affect the performance of public project in Malaysia. To achieve the objective of this study, 140 sets of questionnaire have been sending to twenty (20) companies and eight (8) Jabatan Kerja Raya (JKR) main branches around Malaysia. Average Index (AT) method have been use to analyze data that has been collected. It was found that, there are eleven (11) types of public project and the highest occurrence is public facilities project. Nevertheless, there are twelve (12) problems of handling public project in Malaysia and the highest frequency of occurrence is social issues. There are four factors that affect the performance of public project in Malaysia which are cost, time, quality and safety and health and the critical factor that affects the performance of public project is cost. Future study can be done about how to control the problems of handling public project in Malaysia which is can affect the performance of public project, how these four (4) factors which are cost, time, quality, and safety and health will affect the performance of public project, and how to control the factors that affect the performance of public project.
format Undergraduates Project Papers
author Norsyahidatul Nazirah , Ismail
author_facet Norsyahidatul Nazirah , Ismail
author_sort Norsyahidatul Nazirah , Ismail
title Factors that affect the performance of public project in Malaysia
title_short Factors that affect the performance of public project in Malaysia
title_full Factors that affect the performance of public project in Malaysia
title_fullStr Factors that affect the performance of public project in Malaysia
title_full_unstemmed Factors that affect the performance of public project in Malaysia
title_sort factors that affect the performance of public project in malaysia
publishDate 2012
url http://umpir.ump.edu.my/id/eprint/7884/1/NORSYAHIDATUL_NAZIRAH_BINTI_ISMAIL.PDF
http://umpir.ump.edu.my/id/eprint/7884/
_version_ 1703960754040864768