Makespan Minimization of Machines and Automated Guided Vehicles Schedule Using Binary Particle Swarm Optimization

An efficient and optimized Automated Guided Vehicles (AGVs) operation plays a critical role in improving the performance of a Flexible Manufacturing System (FMS). Among the main elements in the implementation of AGV is task scheduling. This is due to the fact that efficient scheduling would enable...

Full description

Saved in:
Bibliographic Details
Main Authors: Md Fauadi, Muhammad Hafidz Fazli, Murata, Tomohiro
Format: Conference or Workshop Item
Language:English
Published: 2010
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/20223/1/Makespan%20Minimization%20of%20Machines%20and%20iaeng.pdf
http://eprints.utem.edu.my/id/eprint/20223/
http://www.iaeng.org/publication/IMECS2010/IMECS2010_pp1897-1902.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknikal Malaysia Melaka
Language: English
Be the first to leave a comment!
You must be logged in first