Experienced of thermal fatigue failure on closed blowdown system line in delay coker unit

Delay coker is one of the most important and profitable units in a refinery plant which consists of a closed blowdown system that is designed to contain blowdown from coke drums to quench tower. Due to constant used at various temperature, pressure, and conditions, components are susceptible to v...

Full description

Saved in:
Bibliographic Details
Main Authors: Awang Ahmad, Mohd Zainuddin, Yob, Mohd Shukri, Mat Tahir, Noor Ayuma, Abd Latif, M.J.
Format: Conference or Workshop Item
Language:English
Published: 2023
Online Access:http://eprints.utem.edu.my/id/eprint/27854/1/Experienced%20of%20thermal%20fatigue%20failure%20on%20closed%20blowdown%20system%20line%20in%20delay%20coker%20unit.pdf
http://eprints.utem.edu.my/id/eprint/27854/
https://link.springer.com/chapter/10.1007/978-981-19-3307-3_3
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknikal Malaysia Melaka
Language: English