Experienced of thermal fatigue failure on closed blowdown system line in delay coker unit
Delay coker is one of the most important and profitable units in a refinery plant which consists of a closed blowdown system that is designed to contain blowdown from coke drums to quench tower. Due to constant used at various temperature, pressure, and conditions, components are susceptible to v...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2023
|
Online Access: | http://eprints.utem.edu.my/id/eprint/27854/1/Experienced%20of%20thermal%20fatigue%20failure%20on%20closed%20blowdown%20system%20line%20in%20delay%20coker%20unit.pdf http://eprints.utem.edu.my/id/eprint/27854/ https://link.springer.com/chapter/10.1007/978-981-19-3307-3_3 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknikal Malaysia Melaka |
Language: | English |
Be the first to leave a comment!