Project managers competency on project performance of green toll road development project in Indonesia
The Green Road Construction development program is a program that has the potential to reduce carbon emissions from road construction. Currently, the Government of the Republic of Indonesia through the Ministry of Public Works and Public Housing together with the Toll Road Business Entity continues...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Mercu Buana
2023
|
Subjects: | |
Online Access: | http://eprints.utm.my/107126/1/MohdZaimiAbd2023_ProjectManagersCompetencyonProjectPerformance.pdf http://eprints.utm.my/107126/ http://dx.doi.org/10.22441/sinergi.2023.3.005 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |
id |
my.utm.107126 |
---|---|
record_format |
eprints |
spelling |
my.utm.1071262024-08-28T07:05:41Z http://eprints.utm.my/107126/ Project managers competency on project performance of green toll road development project in Indonesia Mairizal, Mairizal Alifiardi, Rahmat Gilang Ardi Pratama, Gilang Ardi Pratama Abd. Majid, Mohd. Zaimi Shek, Poi Ngian TA Engineering (General). Civil engineering (General) The Green Road Construction development program is a program that has the potential to reduce carbon emissions from road construction. Currently, the Government of the Republic of Indonesia through the Ministry of Public Works and Public Housing together with the Toll Road Business Entity continues to strive to provide the best service to the community using Toll Roads that are applied to all Toll Roads in Indonesia, especially Green Toll Roads. At the implementation stage, it has not been able to run smoothly because there are several constraining factors such as social and environmental aspects. For this reason, this study aims to find out what factors are needed by a Project Manager who carries out the construction. References are taken from various journals and articles that discuss green toll roads around the world and in Indonesia. This research is a combination of qualitative and quantitative (mixed methods) by distributing questionnaires to several respondents. The results of the factor analysis show that the Project Performance factor (Y) is strongly influenced by the determinant factors namely Knowledge (X1) in terms of Time (X1.3), Cost (X1.4) and Procurement (X1.7). Henceforth, project performance (Y) is also influenced by Knowledge (X1), Skill (X2), and Tools & Techniques (X3). Meanwhile, on the other hand, the Project Performance factor (Y) is also influenced by the Green Toll Road (Z). Universitas Mercu Buana 2023 Article PeerReviewed application/pdf en http://eprints.utm.my/107126/1/MohdZaimiAbd2023_ProjectManagersCompetencyonProjectPerformance.pdf Mairizal, Mairizal and Alifiardi, Rahmat and Gilang Ardi Pratama, Gilang Ardi Pratama and Abd. Majid, Mohd. Zaimi and Shek, Poi Ngian (2023) Project managers competency on project performance of green toll road development project in Indonesia. Sinergi (Indonesia), 27 (3). pp. 333-342. ISSN 1410-2331 http://dx.doi.org/10.22441/sinergi.2023.3.005 DOI:10.22441/sinergi.2023.3.005 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Mairizal, Mairizal Alifiardi, Rahmat Gilang Ardi Pratama, Gilang Ardi Pratama Abd. Majid, Mohd. Zaimi Shek, Poi Ngian Project managers competency on project performance of green toll road development project in Indonesia |
description |
The Green Road Construction development program is a program that has the potential to reduce carbon emissions from road construction. Currently, the Government of the Republic of Indonesia through the Ministry of Public Works and Public Housing together with the Toll Road Business Entity continues to strive to provide the best service to the community using Toll Roads that are applied to all Toll Roads in Indonesia, especially Green Toll Roads. At the implementation stage, it has not been able to run smoothly because there are several constraining factors such as social and environmental aspects. For this reason, this study aims to find out what factors are needed by a Project Manager who carries out the construction. References are taken from various journals and articles that discuss green toll roads around the world and in Indonesia. This research is a combination of qualitative and quantitative (mixed methods) by distributing questionnaires to several respondents. The results of the factor analysis show that the Project Performance factor (Y) is strongly influenced by the determinant factors namely Knowledge (X1) in terms of Time (X1.3), Cost (X1.4) and Procurement (X1.7). Henceforth, project performance (Y) is also influenced by Knowledge (X1), Skill (X2), and Tools & Techniques (X3). Meanwhile, on the other hand, the Project Performance factor (Y) is also influenced by the Green Toll Road (Z). |
format |
Article |
author |
Mairizal, Mairizal Alifiardi, Rahmat Gilang Ardi Pratama, Gilang Ardi Pratama Abd. Majid, Mohd. Zaimi Shek, Poi Ngian |
author_facet |
Mairizal, Mairizal Alifiardi, Rahmat Gilang Ardi Pratama, Gilang Ardi Pratama Abd. Majid, Mohd. Zaimi Shek, Poi Ngian |
author_sort |
Mairizal, Mairizal |
title |
Project managers competency on project performance of green toll road development project in Indonesia |
title_short |
Project managers competency on project performance of green toll road development project in Indonesia |
title_full |
Project managers competency on project performance of green toll road development project in Indonesia |
title_fullStr |
Project managers competency on project performance of green toll road development project in Indonesia |
title_full_unstemmed |
Project managers competency on project performance of green toll road development project in Indonesia |
title_sort |
project managers competency on project performance of green toll road development project in indonesia |
publisher |
Universitas Mercu Buana |
publishDate |
2023 |
url |
http://eprints.utm.my/107126/1/MohdZaimiAbd2023_ProjectManagersCompetencyonProjectPerformance.pdf http://eprints.utm.my/107126/ http://dx.doi.org/10.22441/sinergi.2023.3.005 |
_version_ |
1809136629853454336 |