Improving the performance of precast concrete beam-to-beam connection with inadequate lap length
This paper reports on a feasibility study of different types of precast concrete beam-to-beam connections under inadequate lap length. The aim of the study is to develop a beam-to-beam connection, which is able to produce comparable bond strength with the conventional lapping system although the anc...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/11584/1/LingJenHuaMFKA2007.pdf http://eprints.utm.my/id/eprint/11584/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |