Improving the performance of precast concrete beam-to-beam connection with inadequate lap length
This paper reports on a feasibility study of different types of precast concrete beam-to-beam connections under inadequate lap length. The aim of the study is to develop a beam-to-beam connection, which is able to produce comparable bond strength with the conventional lapping system although the anc...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/11584/1/LingJenHuaMFKA2007.pdf http://eprints.utm.my/id/eprint/11584/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |
id |
my.utm.11584 |
---|---|
record_format |
eprints |
spelling |
my.utm.115842018-08-26T04:53:05Z http://eprints.utm.my/id/eprint/11584/ Improving the performance of precast concrete beam-to-beam connection with inadequate lap length Ling, Jen Hua TA Engineering (General). Civil engineering (General) This paper reports on a feasibility study of different types of precast concrete beam-to-beam connections under inadequate lap length. The aim of the study is to develop a beam-to-beam connection, which is able to produce comparable bond strength with the conventional lapping system although the anchorage length is inadequate. A total of six connections were tested for a preliminary study in Phase I. Then, the connection that gave the best performance was selected as the proposed beam-to-beam connection for further study in Phase II. In the studies, steel plates, bolts and nuts system and welding technique were used to enhance the performance of the anchorage system. The welded end plate connection system shows a satisfactory result as it significantly increases the bearing capacity of bars to resist the slippage between reinforcement and concrete. Several unsatisfactorily connections, however, still show potentials of reaching the required loading capacity. Therefore, modification and improvement can be made to improve their performances. 2007-11 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/11584/1/LingJenHuaMFKA2007.pdf Ling, Jen Hua (2007) Improving the performance of precast concrete beam-to-beam connection with inadequate lap length. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Ling, Jen Hua Improving the performance of precast concrete beam-to-beam connection with inadequate lap length |
description |
This paper reports on a feasibility study of different types of precast concrete beam-to-beam connections under inadequate lap length. The aim of the study is to develop a beam-to-beam connection, which is able to produce comparable bond strength with the conventional lapping system although the anchorage length is inadequate. A total of six connections were tested for a preliminary study in Phase I. Then, the connection that gave the best performance was selected as the proposed beam-to-beam connection for further study in Phase II. In the studies, steel plates, bolts and nuts system and welding technique were used to enhance the performance of the anchorage system. The welded end plate connection system shows a satisfactory result as it significantly increases the bearing capacity of bars to resist the slippage between reinforcement and concrete. Several unsatisfactorily connections, however, still show potentials of reaching the required loading capacity. Therefore, modification and improvement can be made to improve their performances. |
format |
Thesis |
author |
Ling, Jen Hua |
author_facet |
Ling, Jen Hua |
author_sort |
Ling, Jen Hua |
title |
Improving the performance of precast concrete beam-to-beam connection with inadequate lap length |
title_short |
Improving the performance of precast concrete beam-to-beam connection with inadequate lap length |
title_full |
Improving the performance of precast concrete beam-to-beam connection with inadequate lap length |
title_fullStr |
Improving the performance of precast concrete beam-to-beam connection with inadequate lap length |
title_full_unstemmed |
Improving the performance of precast concrete beam-to-beam connection with inadequate lap length |
title_sort |
improving the performance of precast concrete beam-to-beam connection with inadequate lap length |
publishDate |
2007 |
url |
http://eprints.utm.my/id/eprint/11584/1/LingJenHuaMFKA2007.pdf http://eprints.utm.my/id/eprint/11584/ |
_version_ |
1643645722270105600 |