Build Operate and Transfer (BOT) in power plant projects in Iran

Iranian electric power industry has adopted Build Operate Transfer (BOT) approach in a number of projects as an alternative to utilize private sector investment. Therefore, some power plant projects have been successfully implemented through BOT such as South Isfahan power plant as a first BOT power...

Full description

Saved in:
Bibliographic Details
Main Authors: Md. Yusof, Aminah, Salami, Bahman
Format: Conference or Workshop Item
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/34356/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia