Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project

This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing meth...

Full description

Saved in:
Bibliographic Details
Main Author: Jumari, Rozazila
Format: Thesis
Language:English
Published: 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/79024/1/RozazilaJumariMFKM2017.pdf
http://eprints.utm.my/id/eprint/79024/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:110185
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
Description
Summary:This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing method in construction industry such as welding structure, pipe, vessel and etc.. In order to achieve this study, the survey is expected to reveal the level of fatigue in the construction sector via a questionnaire. The survey had covered about 50 respondents chosen from welders in pengerang project. The survey findings were analyzed using statistical analysis package SPSS 20. This study had attempted to find out to investigate applicability of Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project. Finally, this project culminates with a discussion and the general conclusions from the survey findings. The result finding is expected to be adequate and useful information for forthcoming research purpose especially for fatigue among welders.