Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project

This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing meth...

Full description

Saved in:
Bibliographic Details
Main Author: Jumari, Rozazila
Format: Thesis
Language:English
Published: 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/79024/1/RozazilaJumariMFKM2017.pdf
http://eprints.utm.my/id/eprint/79024/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:110185
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Malaysia
Language: English
id my.utm.79024
record_format eprints
spelling my.utm.790242018-09-27T04:14:34Z http://eprints.utm.my/id/eprint/79024/ Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project Jumari, Rozazila TJ Mechanical engineering and machinery This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing method in construction industry such as welding structure, pipe, vessel and etc.. In order to achieve this study, the survey is expected to reveal the level of fatigue in the construction sector via a questionnaire. The survey had covered about 50 respondents chosen from welders in pengerang project. The survey findings were analyzed using statistical analysis package SPSS 20. This study had attempted to find out to investigate applicability of Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project. Finally, this project culminates with a discussion and the general conclusions from the survey findings. The result finding is expected to be adequate and useful information for forthcoming research purpose especially for fatigue among welders. 2017-07 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/79024/1/RozazilaJumariMFKM2017.pdf Jumari, Rozazila (2017) Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Mechanical Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:110185
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Jumari, Rozazila
Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project
description This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing method in construction industry such as welding structure, pipe, vessel and etc.. In order to achieve this study, the survey is expected to reveal the level of fatigue in the construction sector via a questionnaire. The survey had covered about 50 respondents chosen from welders in pengerang project. The survey findings were analyzed using statistical analysis package SPSS 20. This study had attempted to find out to investigate applicability of Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project. Finally, this project culminates with a discussion and the general conclusions from the survey findings. The result finding is expected to be adequate and useful information for forthcoming research purpose especially for fatigue among welders.
format Thesis
author Jumari, Rozazila
author_facet Jumari, Rozazila
author_sort Jumari, Rozazila
title Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project
title_short Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project
title_full Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project
title_fullStr Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project
title_full_unstemmed Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project
title_sort determination of work-rest schedule based on fatigue among welders at construction of marine facility pengerang project
publishDate 2017
url http://eprints.utm.my/id/eprint/79024/1/RozazilaJumariMFKM2017.pdf
http://eprints.utm.my/id/eprint/79024/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:110185
_version_ 1643658075483144192