Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project
This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing meth...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/79024/1/RozazilaJumariMFKM2017.pdf http://eprints.utm.my/id/eprint/79024/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:110185 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Malaysia |
Language: | English |
id |
my.utm.79024 |
---|---|
record_format |
eprints |
spelling |
my.utm.790242018-09-27T04:14:34Z http://eprints.utm.my/id/eprint/79024/ Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project Jumari, Rozazila TJ Mechanical engineering and machinery This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing method in construction industry such as welding structure, pipe, vessel and etc.. In order to achieve this study, the survey is expected to reveal the level of fatigue in the construction sector via a questionnaire. The survey had covered about 50 respondents chosen from welders in pengerang project. The survey findings were analyzed using statistical analysis package SPSS 20. This study had attempted to find out to investigate applicability of Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project. Finally, this project culminates with a discussion and the general conclusions from the survey findings. The result finding is expected to be adequate and useful information for forthcoming research purpose especially for fatigue among welders. 2017-07 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/79024/1/RozazilaJumariMFKM2017.pdf Jumari, Rozazila (2017) Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Mechanical Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:110185 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Jumari, Rozazila Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project |
description |
This study is keen on Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project that could help construction company in Malaysia to gain information and knowledge about fatigue during welding work. A welding work as common practicing method in construction industry such as welding structure, pipe, vessel and etc.. In order to achieve this study, the survey is expected to reveal the level of fatigue in the construction sector via a questionnaire. The survey had covered about 50 respondents chosen from welders in pengerang project. The survey findings were analyzed using statistical analysis package SPSS 20. This study had attempted to find out to investigate applicability of Determination of Work-Rest Schedule Based on Fatigue Among Welders at Construction of Marine Facility Pengerang Project. Finally, this project culminates with a discussion and the general conclusions from the survey findings. The result finding is expected to be adequate and useful information for forthcoming research purpose especially for fatigue among welders. |
format |
Thesis |
author |
Jumari, Rozazila |
author_facet |
Jumari, Rozazila |
author_sort |
Jumari, Rozazila |
title |
Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project |
title_short |
Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project |
title_full |
Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project |
title_fullStr |
Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project |
title_full_unstemmed |
Determination of work-rest schedule based on fatigue among welders at construction of marine facility Pengerang project |
title_sort |
determination of work-rest schedule based on fatigue among welders at construction of marine facility pengerang project |
publishDate |
2017 |
url |
http://eprints.utm.my/id/eprint/79024/1/RozazilaJumariMFKM2017.pdf http://eprints.utm.my/id/eprint/79024/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:110185 |
_version_ |
1643658075483144192 |