Review on Uncertainties Causing Time and Cost Overrun in Construction Projects
In order to plan and manage a successful project, the three parameters of time, cost and quality should be considered. The clients in the construction industry are primarily concerned with quality, time and cost. But majority of construction projects are procured on the basis of only two constr...
Saved in:
Main Authors: | , , |
---|---|
Format: | Other |
Published: |
WASET
2011
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/6733/1/waset_thailand_rama.pdf http://eprints.utp.edu.my/6733/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Petronas |
id |
my.utp.eprints.6733 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.67332017-01-19T08:22:52Z Review on Uncertainties Causing Time and Cost Overrun in Construction Projects B. Idrus, Arazi Sambu Potty, Narayanan C.T, Ramanathan TA Engineering (General). Civil engineering (General) In order to plan and manage a successful project, the three parameters of time, cost and quality should be considered. The clients in the construction industry are primarily concerned with quality, time and cost. But majority of construction projects are procured on the basis of only two constraints time and cost. In construction projects not only is on-time delivery important, it also translates directly into whether the contractor will meet the client requirement, quality and provide a return on investment. Delivering a project on time does not occur by hoping that the required completion date will be met. Attempting to solve the unforeseen issues during a project without a plan in place to determine the immediate impact is a major risk which can often lead to delayed projects. The purpose of this review is to explore how time and cost management on construction projects are perceived in various research works. In order to examine the uncertainty of cost and time in effective management of project, the opinions of clients, architects, quantity surveyors, project managers, consulting engineers and contractors are obtained by means of questionnaire survey. Different studies has drawn different conclusions and recommendations with respect to perception of time and cost in construction projects. WASET 2011-03-29 Other NonPeerReviewed application/pdf http://eprints.utp.edu.my/6733/1/waset_thailand_rama.pdf B. Idrus, Arazi and Sambu Potty, Narayanan and C.T, Ramanathan (2011) Review on Uncertainties Causing Time and Cost Overrun in Construction Projects. WASET, Bangkok, Thailand. http://eprints.utp.edu.my/6733/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) B. Idrus, Arazi Sambu Potty, Narayanan C.T, Ramanathan Review on Uncertainties Causing Time and Cost Overrun in Construction Projects |
description |
In order to plan and manage a successful project,
the three parameters of time, cost and quality should be
considered. The clients in the construction industry are
primarily concerned with quality, time and cost. But majority of
construction projects are procured on the basis of only two
constraints time and cost. In construction projects not only is
on-time delivery important, it also translates directly into
whether the contractor will meet the client requirement, quality
and provide a return on investment. Delivering a project on time
does not occur by hoping that the required completion date will
be met. Attempting to solve the unforeseen issues during a
project without a plan in place to determine the immediate
impact is a major risk which can often lead to delayed projects.
The purpose of this review is to explore how time and cost
management on construction projects are perceived in various
research works. In order to examine the uncertainty of cost and
time in effective management of project, the opinions of clients,
architects, quantity surveyors, project managers, consulting
engineers and contractors are obtained by means of
questionnaire survey. Different studies has drawn different
conclusions and recommendations with respect to perception of
time and cost in construction projects. |
format |
Other |
author |
B. Idrus, Arazi Sambu Potty, Narayanan C.T, Ramanathan |
author_facet |
B. Idrus, Arazi Sambu Potty, Narayanan C.T, Ramanathan |
author_sort |
B. Idrus, Arazi |
title |
Review on Uncertainties Causing Time and Cost
Overrun in Construction Projects |
title_short |
Review on Uncertainties Causing Time and Cost
Overrun in Construction Projects |
title_full |
Review on Uncertainties Causing Time and Cost
Overrun in Construction Projects |
title_fullStr |
Review on Uncertainties Causing Time and Cost
Overrun in Construction Projects |
title_full_unstemmed |
Review on Uncertainties Causing Time and Cost
Overrun in Construction Projects |
title_sort |
review on uncertainties causing time and cost
overrun in construction projects |
publisher |
WASET |
publishDate |
2011 |
url |
http://eprints.utp.edu.my/6733/1/waset_thailand_rama.pdf http://eprints.utp.edu.my/6733/ |
_version_ |
1738655516810280960 |