The study of procurement procedures of construction materials used in vertical structures.
Abstract. Contractors of different classes only aim is to maximize the profit. In achieving this aim, delays are prevented and better eliminated. Delays in construction projects and wastage of materials result to additional costs and will eventually lead to losses. The purchasing of materials pl...
Saved in:
Main Authors: | Borlaza, Antolin., Delgado, Xerxes Anthony, San Gabriel, Karen Ann |
---|---|
Format: | text |
Published: |
Animo Repository
2002
|
Online Access: | https://animorepository.dlsu.edu.ph/etd_bachelors/10224 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Similar Items
-
Positioning Public Procurement as a Procedural Tool for Innovation: An Empirical Study
by: Mehmet Akif Demircioglu, et al.
Published: (2021) -
Procurement of equipment for construction projects funded by the government
by: Dinh, Hong Hai
Published: (2017) -
Engineering, procurement and construction method versus traditional method of design, bid, and construct: a comparative case study on construction projects in the Philippines
by: Coronel, Mikael, et al.
Published: (2016) -
A study on the effects of cost of materials on vertical structure among the top 20 construction companies in Metro Manila
by: Martinez, Maria Anna F., et al.
Published: (1982) -
Electronic procurement strategy and practice in the Singapore construction industry
by: Wang, Fang
Published: (2008)