A 10-kilo watt electronic load controller for micro-hydro power plant in Abra.
For years, rural development has been impeded by the lack or limited source of power. The development of micro-hydro electric power plant presents a great solution to power distribution problems in remote areas of our country. The abundance of water in our country provides the most effective solutio...
Saved in:
Main Authors: | , , , |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
1999
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/etd_bachelors/10236 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |