A systems study on the fit-out phase of company x engineering, design and development department

The thesis study prepared is a systems study on the fit-out phase for city mall construction projects of the Engineering, Design and Development (EDD) of Company X. The study focused on analyzing the system currently used by EDD in their daily operations for the past six (6) mall construction projec...

Full description

Saved in:
Bibliographic Details
Main Authors: Caparas, Marianne D., Liu, Trisha Vanessa T., NemSingh, Jenina Grace T.
Format: text
Language:English
Published: Animo Repository 2012
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/10593
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
Be the first to leave a comment!
You must be logged in first