A project feasibility study on krib-4-keeps
Saved in:
Main Authors: | Chua, Michael, Figueroa, Nolette Mara, Ng, Anthony Sy, Oranga, Philline, Tan, Joelyrose, Uygongco, Ethel Joy, Yao, Mary Grace, Yu, Jean Valen |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
1998
|
Online Access: | https://animorepository.dlsu.edu.ph/etd_bachelors/13613 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |
Similar Items
-
Kajian Pengaruh Konfigurasi Krib Terhadap Pola Arus Di Belokan
by: Perpustakaan UGM, i-lib
Published: (2002) -
Kajian pengaruh konfigurasi krib terhadap pola arus di belokan
by: , SUJATMOKO, Bambang, et al.
Published: (2001) -
The pieces we keep : the project book
by: Sim, Joy Kia Him, et al.
Published: (2021) -
Studi model numerik aliran 2D-horizontal pada kasus pemasangan krib di estuari
by: , SUHARJOKO, et al.
Published: (1999) -
Kajian gerusan lokal di sekitar Krib dengan model numerik SSIIM Win 1.1
by: , HADIPRAMONO, Supardjono, et al.
Published: (2003)