A systems study on the production of BA 45 stick ball pen of Lupel Corporation

Lupel Manufacturing Corporation is the sole distributor of Mitsubishi Writing Instruments in the Philippines. Lupel also manufactures its own brand of stick ball pen using the refills of Mitsubishi. In this study, the focus was placed on the production process of BA 45 stick ball pen. The production...

Full description

Saved in:
Bibliographic Details
Main Authors: Macapagal, Romeo L., Solomon, Gerard
Format: text
Language:English
Published: Animo Repository 2001
Subjects:
Online Access:https://animorepository.dlsu.edu.ph/etd_bachelors/4211
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University
Language: English
id oai:animorepository.dlsu.edu.ph:etd_bachelors-5039
record_format eprints
spelling oai:animorepository.dlsu.edu.ph:etd_bachelors-50392021-02-08T02:42:42Z A systems study on the production of BA 45 stick ball pen of Lupel Corporation Macapagal, Romeo L. Solomon, Gerard Lupel Manufacturing Corporation is the sole distributor of Mitsubishi Writing Instruments in the Philippines. Lupel also manufactures its own brand of stick ball pen using the refills of Mitsubishi. In this study, the focus was placed on the production process of BA 45 stick ball pen. The production Department of Lupel Manufacturing Corporation can be divided into two basic sections, the Injection Section, and the Assembly Section. The Injection Section can be further divided into four sections, the barrel, cap, mouthpiece, and tail-end injection sections respectively. Through the study it was found out that the barrel, cap, mouthpiece, and tail-end injection section was underutilized by 9.37%, 5.39%, and 8.89% respectively. The assembly section was underutilized by 18.24%. After doing some analysis, the group found out that underutilization in the injection section was mainly caused by machine breakdowns due to timing belt failure. Underutilization in the Assembly Section on the other hand was caused by the inability of the contractual assembly workers to meet their quota. In order to decrease if not eliminate underutilization in the Injection Section, a new procedure for changing the timing belts was proposed. The proposed solution requires the regular changing of the timing belts during Saturdays. For the Assembly Section the group proposed to hire 3 more regular assembly workers. The general objective of this study is to decrease underutilization of the Production Department to at most 5% of the standard and to meet at least 80% of all orders placed. Through the proposed system an almost 100% utilization of the Production Department is expected. This is equivalent to P 153,282 per month increase in profit. 2001-01-01T08:00:00Z text https://animorepository.dlsu.edu.ph/etd_bachelors/4211 Bachelor's Theses English Animo Repository Production control, Root cause analysis Industrial Engineering
institution De La Salle University
building De La Salle University Library
continent Asia
country Philippines
Philippines
content_provider De La Salle University Library
collection DLSU Institutional Repository
language English
topic Production control, Root cause analysis
Industrial Engineering
spellingShingle Production control, Root cause analysis
Industrial Engineering
Macapagal, Romeo L.
Solomon, Gerard
A systems study on the production of BA 45 stick ball pen of Lupel Corporation
description Lupel Manufacturing Corporation is the sole distributor of Mitsubishi Writing Instruments in the Philippines. Lupel also manufactures its own brand of stick ball pen using the refills of Mitsubishi. In this study, the focus was placed on the production process of BA 45 stick ball pen. The production Department of Lupel Manufacturing Corporation can be divided into two basic sections, the Injection Section, and the Assembly Section. The Injection Section can be further divided into four sections, the barrel, cap, mouthpiece, and tail-end injection sections respectively. Through the study it was found out that the barrel, cap, mouthpiece, and tail-end injection section was underutilized by 9.37%, 5.39%, and 8.89% respectively. The assembly section was underutilized by 18.24%. After doing some analysis, the group found out that underutilization in the injection section was mainly caused by machine breakdowns due to timing belt failure. Underutilization in the Assembly Section on the other hand was caused by the inability of the contractual assembly workers to meet their quota. In order to decrease if not eliminate underutilization in the Injection Section, a new procedure for changing the timing belts was proposed. The proposed solution requires the regular changing of the timing belts during Saturdays. For the Assembly Section the group proposed to hire 3 more regular assembly workers. The general objective of this study is to decrease underutilization of the Production Department to at most 5% of the standard and to meet at least 80% of all orders placed. Through the proposed system an almost 100% utilization of the Production Department is expected. This is equivalent to P 153,282 per month increase in profit.
format text
author Macapagal, Romeo L.
Solomon, Gerard
author_facet Macapagal, Romeo L.
Solomon, Gerard
author_sort Macapagal, Romeo L.
title A systems study on the production of BA 45 stick ball pen of Lupel Corporation
title_short A systems study on the production of BA 45 stick ball pen of Lupel Corporation
title_full A systems study on the production of BA 45 stick ball pen of Lupel Corporation
title_fullStr A systems study on the production of BA 45 stick ball pen of Lupel Corporation
title_full_unstemmed A systems study on the production of BA 45 stick ball pen of Lupel Corporation
title_sort systems study on the production of ba 45 stick ball pen of lupel corporation
publisher Animo Repository
publishDate 2001
url https://animorepository.dlsu.edu.ph/etd_bachelors/4211
_version_ 1772834630229032960