Improving maintainability in the operation of a hydroelectric power plant through knowledge sharing and collaboration
Availability, as a function ofreliability and maintainability, is a fundamental determinant of whether a project will be viable in the energy sector. While system reliability and maintainability are equally important, maintainability is the factor that is significantly influenced by the performance...
Saved in:
Main Author: | Santiago, John Ezekiel M. |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
2019
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/etd_masteral/6829 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |
Similar Items
-
Binga Hydroelectric Plant project: Status of the project
by: Maschinen & Technik, Inc., et al.
Published: (2006) -
Binga Hydroelectric Power Plant: Concept development - reservoir dredging
by: Escolar, Anthony C.
Published: (2001) -
Microcontroller-based automatic control and telemetry system for the Gacab, Abra micro-hydroelectric power plant
by: Gillo, Alvin Edward L., et al.
Published: (2007) -
23.50 MW Caliraya hydroelectric power plant, Lumban, Laguna - Philippines
by: Juvida, Jules C.
Published: (2001) -
A study of an induction generator and its load controller for micro-hydroelectric plant
by: Ang, Charlie, et al.
Published: (1997)