P-graph approach to human resource reallocation in industrial plants under crisis conditions
P-graph methodology was originally proposed as a systematic approach to process network synthesis (PNS). However, this graph theoretic approach has also been applied to a broad range of problems with similar structure as PNS. In particular, recent work has demonstrated the similarity of PNS problems...
Saved in:
Main Authors: | , , , |
---|---|
Format: | text |
Published: |
Animo Repository
2017
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/faculty_research/144 https://animorepository.dlsu.edu.ph/context/faculty_research/article/1143/type/native/viewcontent |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
id |
oai:animorepository.dlsu.edu.ph:faculty_research-1143 |
---|---|
record_format |
eprints |
spelling |
oai:animorepository.dlsu.edu.ph:faculty_research-11432022-08-09T05:56:07Z P-graph approach to human resource reallocation in industrial plants under crisis conditions Aviso, Kathleen B. Cayamanda, Christina D. Mayol, Andres Philip Tan, Raymond Girard R. P-graph methodology was originally proposed as a systematic approach to process network synthesis (PNS). However, this graph theoretic approach has also been applied to a broad range of problems with similar structure as PNS. In particular, recent work has demonstrated the similarity of PNS problems to input-output (IO) optimization problems; the latter class of problems has been applied for physical flows at scales ranging from process plant level to supply chain level. IO models have also been proposed to plan the allocation of human resource in organizations. In this work, a P-graph based approach to reallocation of human resources in an industrial plant during a transient crisis is presented. The model determines how personnel can be reassigned to allow a plant to operate at an alternative temporary steady state when the plant becomes short-handed due to a disruptive external event. This methodology is demonstrated using a representative case study involving an instant coffee plant. Results show that in the occasion that a reduction in available workforce is experienced, workforce is allocated in more critical areas and productivity is maximized by minimizing interaction with less critical departments. 2017-07-18T07:00:00Z text text/html https://animorepository.dlsu.edu.ph/faculty_research/144 https://animorepository.dlsu.edu.ph/context/faculty_research/article/1143/type/native/viewcontent Faculty Research Work Animo Repository Manpower planning Engineering |
institution |
De La Salle University |
building |
De La Salle University Library |
continent |
Asia |
country |
Philippines Philippines |
content_provider |
De La Salle University Library |
collection |
DLSU Institutional Repository |
topic |
Manpower planning Engineering |
spellingShingle |
Manpower planning Engineering Aviso, Kathleen B. Cayamanda, Christina D. Mayol, Andres Philip Tan, Raymond Girard R. P-graph approach to human resource reallocation in industrial plants under crisis conditions |
description |
P-graph methodology was originally proposed as a systematic approach to process network synthesis (PNS). However, this graph theoretic approach has also been applied to a broad range of problems with similar structure as PNS. In particular, recent work has demonstrated the similarity of PNS problems to input-output (IO) optimization problems; the latter class of problems has been applied for physical flows at scales ranging from process plant level to supply chain level. IO models have also been proposed to plan the allocation of human resource in organizations. In this work, a P-graph based approach to reallocation of human resources in an industrial plant during a transient crisis is presented. The model determines how personnel can be reassigned to allow a plant to operate at an alternative temporary steady state when the plant becomes short-handed due to a disruptive external event. This methodology is demonstrated using a representative case study involving an instant coffee plant. Results show that in the occasion that a reduction in available workforce is experienced, workforce is allocated in more critical areas and productivity is maximized by minimizing interaction with less critical departments. |
format |
text |
author |
Aviso, Kathleen B. Cayamanda, Christina D. Mayol, Andres Philip Tan, Raymond Girard R. |
author_facet |
Aviso, Kathleen B. Cayamanda, Christina D. Mayol, Andres Philip Tan, Raymond Girard R. |
author_sort |
Aviso, Kathleen B. |
title |
P-graph approach to human resource reallocation in industrial plants under crisis conditions |
title_short |
P-graph approach to human resource reallocation in industrial plants under crisis conditions |
title_full |
P-graph approach to human resource reallocation in industrial plants under crisis conditions |
title_fullStr |
P-graph approach to human resource reallocation in industrial plants under crisis conditions |
title_full_unstemmed |
P-graph approach to human resource reallocation in industrial plants under crisis conditions |
title_sort |
p-graph approach to human resource reallocation in industrial plants under crisis conditions |
publisher |
Animo Repository |
publishDate |
2017 |
url |
https://animorepository.dlsu.edu.ph/faculty_research/144 https://animorepository.dlsu.edu.ph/context/faculty_research/article/1143/type/native/viewcontent |
_version_ |
1740844746734043136 |