A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013

Time is as valuable as money, and every company has set their aim on costreduction through process engineering. In accordance to the matter, the company, Kane Industrial Corporation still experiences production loss rooting from productivity problems even beyond of its success as a top manufactur...

Full description

Saved in:
Bibliographic Details
Main Author: Castillo, Kier S.
Format: Theses and Dissertations NonPeerReviewed
Published: 2014
Subjects:
Online Access:http://thesis.dlsud.edu.ph/207/7/CastilloKS%20...%20-%20Welcoat.pdf
http://thesis.dlsud.edu.ph/207/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University