A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013
Time is as valuable as money, and every company has set their aim on costreduction through process engineering. In accordance to the matter, the company, Kane Industrial Corporation still experiences production loss rooting from productivity problems even beyond of its success as a top manufactur...
Saved in:
Main Author: | |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
2014
|
Subjects: | |
Online Access: | http://thesis.dlsud.edu.ph/207/7/CastilloKS%20...%20-%20Welcoat.pdf http://thesis.dlsud.edu.ph/207/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |