A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013
Time is as valuable as money, and every company has set their aim on costreduction through process engineering. In accordance to the matter, the company, Kane Industrial Corporation still experiences production loss rooting from productivity problems even beyond of its success as a top manufactur...
Saved in:
Main Author: | |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
2014
|
Subjects: | |
Online Access: | http://thesis.dlsud.edu.ph/207/7/CastilloKS%20...%20-%20Welcoat.pdf http://thesis.dlsud.edu.ph/207/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
id |
ph-dlsud-lib.207 |
---|---|
record_format |
eprints |
spelling |
ph-dlsud-lib.2072015-11-25T08:46:26Z A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013 Castillo, Kier S. T Technology (General) TS Manufactures Time is as valuable as money, and every company has set their aim on costreduction through process engineering. In accordance to the matter, the company, Kane Industrial Corporation still experiences production loss rooting from productivity problems even beyond of its success as a top manufacturer of cans after 40 years. The problem as identified and analyzed by different methods used by the proponents proved to be rooted on the non-compliance to the set standards in both time and method – the operators work at a much slower pace than the desired pace, inefficient work instruction and working conditions as well as poor preventive maintenance, which in general is poor compliance to the application of time and methods study. Knowing these, the proponent made a study with the focal point of eliminating the average loss of 37.87% in the company’s productivity, with data based on the past six months of production, June to November 2013. Reaching the conclusion of the study, the proponent has made several options, alternative courses of action to meet the standards obtained and to eliminate the recurring loss, which is based on the mix of theoretical and realistic application of time and method principles and guidelines. 2014-05 Thesis NonPeerReviewed text http://thesis.dlsud.edu.ph/207/7/CastilloKS%20...%20-%20Welcoat.pdf Castillo, Kier S. (2014) A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013. Undergraduate thesis, De La Salle University-Dasmarinas. http://thesis.dlsud.edu.ph/207/ |
institution |
De La Salle University |
building |
De La Salle University Library |
country |
Philippines |
collection |
DLSU Institutional Repository |
topic |
T Technology (General) TS Manufactures |
spellingShingle |
T Technology (General) TS Manufactures Castillo, Kier S. A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013 |
description |
Time is as valuable as money, and every company has set their aim on costreduction
through process engineering. In accordance to the matter, the
company, Kane Industrial Corporation still experiences production loss rooting
from productivity problems even beyond of its success as a top manufacturer of
cans after 40 years. The problem as identified and analyzed by different
methods used by the proponents proved to be rooted on the non-compliance to
the set standards in both time and method – the operators work at a much slower
pace than the desired pace, inefficient work instruction and working conditions as
well as poor preventive maintenance, which in general is poor compliance to the
application of time and methods study. Knowing these, the proponent made a
study with the focal point of eliminating the average loss of 37.87% in the
company’s productivity, with data based on the past six months of production,
June to November 2013. Reaching the conclusion of the study, the proponent
has made several options, alternative courses of action to meet the standards
obtained and to eliminate the recurring loss, which is based on the mix of
theoretical and realistic application of time and method principles and guidelines. |
format |
Theses and Dissertations NonPeerReviewed |
author |
Castillo, Kier S. |
author_facet |
Castillo, Kier S. |
author_sort |
Castillo, Kier S. |
title |
A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013 |
title_short |
A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013 |
title_full |
A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013 |
title_fullStr |
A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013 |
title_full_unstemmed |
A study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat AP small tin cans amounting to Php2,883055.00 from the months of June to November 2013 |
title_sort |
study on eliminating the 37.872% production loss in manufacturing 1/4 litre welcoat ap small tin cans amounting to php2,883055.00 from the months of june to november 2013 |
publishDate |
2014 |
url |
http://thesis.dlsud.edu.ph/207/7/CastilloKS%20...%20-%20Welcoat.pdf http://thesis.dlsud.edu.ph/207/ |
_version_ |
1681502402490925056 |