A study on eliminating the 14.88% rework rate in the coating process of 2PK panel center T8 at Philippines Mansho, Inc. amounting to Php 2,257,881.40 from the months of June to November 2013.
This practicum study aims to improve the coating process in the manufacturing of 2PK Panel Center T8 at Philippines Mansho, Incorporated. All the aspects in the production were considered in order to determine the sources of rejects in the workplace. Several quality control tools were used by the...
Saved in:
Main Author: | Kiamzon, Klaudin Emili A. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
2014
|
Subjects: | |
Online Access: | http://thesis.dlsud.edu.ph/208/7/KiamzonKE%20...%20-%20CoatingProcess.pdf http://thesis.dlsud.edu.ph/208/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Similar Items
-
A study on eliminating the 17.95% production loss in the manufacturing of EU Cover ESCN automotive parts at Philippines Mansho Incorporated amounting to Php 1,678,647.60 from June to November 2013.
by: Manguerra, Maria Suzaine P.
Published: (2014) -
Lagu (Musik dengan Teks): Sholawat Kangen
by: Gancar Candra Premananto
Published: (2018) -
Kita Berdua
by: Gancar Candra Premananto
Published: (2018) -
Azzarine
by: Gancar Candra Premananto, et al.
Published: (2018) -
Kala Cinta Tak Terbalas
by: Gancar Candra Premananto
Published: (2018)