A study in minimizing the 15.88% production loss in the production of coat at Onesimus Corporation amounting to Php 10,350,169.98 from the month of June-November 2013.

This practicum study is about minimizing the 15.88% productivity loss of coat in Onesimus Corporation for the Month of June to November 2013. The factors that caused delay in the production have been identified and planned an action for each of them. These factors that contribute to delays are th...

Full description

Saved in:
Bibliographic Details
Main Author: Nuestro, Julius Jordan N.
Format: Theses and Dissertations NonPeerReviewed
Published: 2014
Subjects:
Online Access:http://thesis.dlsud.edu.ph/221/7/NuestroJJ%20...%20-%20OnesimusCorporation.pdf
http://thesis.dlsud.edu.ph/221/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: De La Salle University