The elimination of the material loss in the production area of Liwayway Marketing Corporation.
ABSTRACT see Upload (IT 89 2006)
Saved in:
Main Author: | Lauzon, Lesley-Anne N. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
2006
|
Subjects: | |
Online Access: | http://thesis.dlsud.edu.ph/5059/1/IT%20089%202006.pdf http://thesis.dlsud.edu.ph/5059/2/LauzonLA%20...%20-%20Liwayway.pdf http://thesis.dlsud.edu.ph/5059/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Similar Items
-
A study on productivity loss of Oishi's Sundays Mango Juice 45g at Liwayway Marketing Corporation.
by: Camia, Rodrigo III R.
Published: (2009) -
Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation.
by: Gonzaga, Philip A., et al.
Published: (2001) -
Improvement of dough sheet cutting time by 73.2% in the manufacture of different chips and crackers in Liwayway Marketing Corporation.
by: Nadal, Karl Lawrence M., et al.
Published: (2002) -
The elimination of the downgrades on the roll forming process of the Production Area at Philmetal Products, Inc.
by: Arienda, Joshua, et al.
Published: (2006) -
A study on eliminating the 6.02% productivity loss in the delivery process of raw materials amounting to Php 28,710.00 from the months of June to November 2013.
by: Espino, Joana Rizza N.
Published: (2014)