Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation.
ABSTRACT see Upload (IT 111 2001)
Saved in:
Main Authors: | , , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
2001
|
Subjects: | |
Online Access: | http://thesis.dlsud.edu.ph/5085/1/GonzagaLariosaMendoza%20...%20-%20Liwayway.pdf http://thesis.dlsud.edu.ph/5085/2/IT%20111%202001.pdf http://thesis.dlsud.edu.ph/5085/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
id |
ph-dlsud-lib.5085 |
---|---|
record_format |
eprints |
spelling |
ph-dlsud-lib.50852017-04-18T05:34:18Z Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation. Gonzaga, Philip A. Lariosa, Brian L. Mendoza, Ryan A T Technology (General) TS Manufactures ABSTRACT see Upload (IT 111 2001) 2001 Thesis NonPeerReviewed text http://thesis.dlsud.edu.ph/5085/1/GonzagaLariosaMendoza%20...%20-%20Liwayway.pdf text http://thesis.dlsud.edu.ph/5085/2/IT%20111%202001.pdf Gonzaga, Philip A. and Lariosa, Brian L. and Mendoza, Ryan A (2001) Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation. Undergraduate thesis, De La Salle University-Dasmariñas. http://thesis.dlsud.edu.ph/5085/ |
institution |
De La Salle University |
building |
De La Salle University Library |
country |
Philippines |
collection |
DLSU Institutional Repository |
topic |
T Technology (General) TS Manufactures |
spellingShingle |
T Technology (General) TS Manufactures Gonzaga, Philip A. Lariosa, Brian L. Mendoza, Ryan A Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation. |
description |
ABSTRACT see Upload (IT 111 2001) |
format |
Theses and Dissertations NonPeerReviewed |
author |
Gonzaga, Philip A. Lariosa, Brian L. Mendoza, Ryan A |
author_facet |
Gonzaga, Philip A. Lariosa, Brian L. Mendoza, Ryan A |
author_sort |
Gonzaga, Philip A. |
title |
Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation. |
title_short |
Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation. |
title_full |
Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation. |
title_fullStr |
Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation. |
title_full_unstemmed |
Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation. |
title_sort |
failure to meet 22% of the projected production output due to machine shutdown of liwayway marketing corporation. |
publishDate |
2001 |
url |
http://thesis.dlsud.edu.ph/5085/1/GonzagaLariosaMendoza%20...%20-%20Liwayway.pdf http://thesis.dlsud.edu.ph/5085/2/IT%20111%202001.pdf http://thesis.dlsud.edu.ph/5085/ |
_version_ |
1681503176401879040 |