Failure to meet 22% of the projected production output due to machine shutdown of Liwayway Marketing Corporation.
ABSTRACT see Upload (IT 111 2001)
Saved in:
Main Authors: | Gonzaga, Philip A., Lariosa, Brian L., Mendoza, Ryan A |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
2001
|
Subjects: | |
Online Access: | http://thesis.dlsud.edu.ph/5085/1/GonzagaLariosaMendoza%20...%20-%20Liwayway.pdf http://thesis.dlsud.edu.ph/5085/2/IT%20111%202001.pdf http://thesis.dlsud.edu.ph/5085/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Similar Items
-
The elimination of the material loss in the production area of Liwayway Marketing Corporation.
by: Lauzon, Lesley-Anne N.
Published: (2006) -
Raw materials and finished products are being placed in non-designated areas due to insufficient storage area (Leader Cable Philippines Corporation).
by: Lariosa, Brian L., et al.
Published: (2002) -
A study on productivity loss of Oishi's Sundays Mango Juice 45g at Liwayway Marketing Corporation.
by: Camia, Rodrigo III R.
Published: (2009) -
Improvement of dough sheet cutting time by 73.2% in the manufacture of different chips and crackers in Liwayway Marketing Corporation.
by: Nadal, Karl Lawrence M., et al.
Published: (2002) -
A study to meet the allowable 2% rejection rate in the production of IMV25 of Famous Secret Precision Machining Inc.
by: Morales, , Ma. Claudette T.
Published: (2015)