Heuristic control of multiple batch processors with incompatible job families and future job arrivals
We analyse the problem of minimising the mean cycle time of a batch processing stage containing K > 1 batch processors in parallel with incompatible job families and future job arrivals. We provide an integer linear programming formulation and a dynamic program formulation for small problem insta...
Saved in:
Main Authors: | Tajan, John Benedict C., Sivakumar, Appa Iyer., Gershwin, Stanley B. |
---|---|
Other Authors: | School of Mechanical and Aerospace Engineering |
Format: | Article |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/104295 http://hdl.handle.net/10220/16994 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Evaluating the performance of look-ahead policies for upstream serial processor with downstream batch processor serving incompatible job families and finite buffer sizes
by: Tajan, John Benedict C., et al.
Published: (2013) -
A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
by: Chua, Jason Zhen Sheng
Published: (2014) -
Yard crane dispatching to minimize maximum tardiness of the jobs
by: Wan, Zhi Yong
Published: (2014) -
Handling ready time uncertainties in dispatching automated guided vehicles to minimize job tardiness in container terminals
by: Ng, Jun Hao
Published: (2015) -
Parallel strategies for reduced number of processors applied for CFD simulations on workstations
by: Popescu, Cristian-Claudiu
Published: (2010)