Heuristic control of multiple batch processors with incompatible job families and future job arrivals
We analyse the problem of minimising the mean cycle time of a batch processing stage containing K > 1 batch processors in parallel with incompatible job families and future job arrivals. We provide an integer linear programming formulation and a dynamic program formulation for small problem insta...
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Article |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/104295 http://hdl.handle.net/10220/16994 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Be the first to leave a comment!