A sampling approach for proactive project scheduling under generalized time-dependent workability uncertainty
In real-world project scheduling applications, activity durations are often uncertain. Proactive scheduling can effectively cope with the duration uncertainties, by generating robust baseline solutions according to a priori stochastic knowledge. However, most of the existing proactive approaches ass...
Saved in:
Main Authors: | Song, Wen, Kang, Donghun, Zhang, Jie, Cao, Zhiguang, Xi, Hui |
---|---|
Other Authors: | School of Computer Science and Engineering |
Format: | Article |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/105754 http://hdl.handle.net/10220/48729 http://dx.doi.org/10.1613/jair.1.11369 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
A sampling approach for proactive project scheduling under generalized time-dependent workability uncertainty
by: SONG, Wen, et al.
Published: (2019) -
On a paper by Christofides et al. for solving the multiple-resource constrained, single project scheduling problem
by: Demeulemeester, E., et al.
Published: (2013) -
Scheduling of flexible-sequenced process plans in a mould manufacturing shop
by: Gan, P.Y., et al.
Published: (2014) -
Subordinate's proactivity in performance planning: implications for performance management systems
by: Presbitero, Alfred, et al.
Published: (2017) -
Design and analysis of algorithms for solving a class of routing shop scheduling problems
by: LIU SHUBIN
Published: (2011)