Structural responses of secondary lining of high-speed railway tunnel excavated in loess ground

To systematically study the mechanical properties and structural responses of the secondary lining for high-speed railway tunnels excavated in loess ground, on-site monitoring was performed to measure the contact pressure between the primary lining and secondary lining. It is found that the contact...

Full description

Saved in:
Bibliographic Details
Main Authors: Zhang, Dingli, Fang, Qian, Li, Pengfei, Wong, Louis Ngai Yuen
Other Authors: School of Civil and Environmental Engineering
Format: Article
Language:English
Published: 2014
Subjects:
Online Access:https://hdl.handle.net/10356/106536
http://hdl.handle.net/10220/24018
http://dx.doi.org/10.1260/1369-4332.16.8.1371
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
Description
Summary:To systematically study the mechanical properties and structural responses of the secondary lining for high-speed railway tunnels excavated in loess ground, on-site monitoring was performed to measure the contact pressure between the primary lining and secondary lining. It is found that the contact pressure reaches its first peak value when the tunnel formwork carriage is removed. The load acting on secondary lining is in the form of deformation pressure, which is different from the loose pressure prescribed in the China Tunnel Design Standard. The results obtained from this study enhance our understanding towards the mechanical characteristics of secondary lining for high-speed railway tunnels and are also beneficial to secondary lining design.