Structural responses of secondary lining of high-speed railway tunnel excavated in loess ground

To systematically study the mechanical properties and structural responses of the secondary lining for high-speed railway tunnels excavated in loess ground, on-site monitoring was performed to measure the contact pressure between the primary lining and secondary lining. It is found that the contact...

全面介紹

Saved in:
書目詳細資料
Main Authors: Zhang, Dingli, Fang, Qian, Li, Pengfei, Wong, Louis Ngai Yuen
其他作者: School of Civil and Environmental Engineering
格式: Article
語言:English
出版: 2014
主題:
在線閱讀:https://hdl.handle.net/10356/106536
http://hdl.handle.net/10220/24018
http://dx.doi.org/10.1260/1369-4332.16.8.1371
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Nanyang Technological University
語言: English
實物特徵
總結:To systematically study the mechanical properties and structural responses of the secondary lining for high-speed railway tunnels excavated in loess ground, on-site monitoring was performed to measure the contact pressure between the primary lining and secondary lining. It is found that the contact pressure reaches its first peak value when the tunnel formwork carriage is removed. The load acting on secondary lining is in the form of deformation pressure, which is different from the loose pressure prescribed in the China Tunnel Design Standard. The results obtained from this study enhance our understanding towards the mechanical characteristics of secondary lining for high-speed railway tunnels and are also beneficial to secondary lining design.