Ground behaviour due to tunnelling at MRT NEL C-705 project
This thesis discusses the ground response due to tunnelling at MRT NEL Contract C-705 project. In particular it examines the correlation between volume losses and the applied face pressure for different soil types encountered by the tunnel face during its route.
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/12209 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-12209 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-122092023-03-03T19:38:10Z Ground behaviour due to tunnelling at MRT NEL C-705 project Dave Jugo Prakoso Witjaksono Ashraf Mohamed Hefny School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Geotechnical This thesis discusses the ground response due to tunnelling at MRT NEL Contract C-705 project. In particular it examines the correlation between volume losses and the applied face pressure for different soil types encountered by the tunnel face during its route. Master of Science (Geotechnical Engineering) 2008-09-25T06:40:10Z 2008-09-25T06:40:10Z 2004 2004 Thesis http://hdl.handle.net/10356/12209 en Nanyang Technological University 56 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Civil engineering::Geotechnical |
spellingShingle |
DRNTU::Engineering::Civil engineering::Geotechnical Dave Jugo Prakoso Witjaksono Ground behaviour due to tunnelling at MRT NEL C-705 project |
description |
This thesis discusses the ground response due to tunnelling at MRT NEL Contract C-705 project. In particular it examines the correlation between volume losses and the applied face pressure for different soil types encountered by the tunnel face during its route. |
author2 |
Ashraf Mohamed Hefny |
author_facet |
Ashraf Mohamed Hefny Dave Jugo Prakoso Witjaksono |
format |
Theses and Dissertations |
author |
Dave Jugo Prakoso Witjaksono |
author_sort |
Dave Jugo Prakoso Witjaksono |
title |
Ground behaviour due to tunnelling at MRT NEL C-705 project |
title_short |
Ground behaviour due to tunnelling at MRT NEL C-705 project |
title_full |
Ground behaviour due to tunnelling at MRT NEL C-705 project |
title_fullStr |
Ground behaviour due to tunnelling at MRT NEL C-705 project |
title_full_unstemmed |
Ground behaviour due to tunnelling at MRT NEL C-705 project |
title_sort |
ground behaviour due to tunnelling at mrt nel c-705 project |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/12209 |
_version_ |
1759857977354878976 |