Problems encountered at the interface between piling and substructure construction
This report examines the potential disputes and interface problems among piling, excavation and building contractors with implications on the current practice of contracts award in Singapore. Many factors are considered when problems are encountered, the common ones being time, cost and the possible...
Saved in:
Main Author: | Chew, Danny Poh Huat. |
---|---|
Other Authors: | Wong, Kai Sin |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/13086 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Design, construction and performance of micro-piles as compared to bored piles
by: Han, Yung Fung.
Published: (2008) -
Interpretation of pile load test results
by: Tan, Danny Jun Xian.
Published: (2009) -
Effects of construction on axial load transfer along bored piles in residual soils
by: Yu, Jin.
Published: (2008) -
Evaluation of load transfer behaviour of bored piles in residual soil incorporating construction effect
by: Zhu, Hong.
Published: (2008) -
Soil heave and pile heave caused by pile installation
by: Gao, Shan
Published: (2008)