Productivity aspects of driven pile operations in Singapore

This study presents findings on pre-cast reinforced concrete driven pile productivity levels. Measurements were made for two case studies on pre-cast reinforced concrete piles utilising a performance indicator for bored piling recently developed by Lee & Mahmood. A comparison has been made betwe...

Full description

Saved in:
Bibliographic Details
Main Author: Hor, Puey Sheng.
Other Authors: Lim, Ewe Chye
Format: Theses and Dissertations
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/6659
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University