導出完成 — 

Productivity aspects of driven pile operations in Singapore

This study presents findings on pre-cast reinforced concrete driven pile productivity levels. Measurements were made for two case studies on pre-cast reinforced concrete piles utilising a performance indicator for bored piling recently developed by Lee & Mahmood. A comparison has been made betwe...

全面介紹

Saved in:
書目詳細資料
主要作者: Hor, Puey Sheng.
其他作者: Lim, Ewe Chye
格式: Theses and Dissertations
出版: 2008
主題:
在線閱讀:http://hdl.handle.net/10356/6659
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Nanyang Technological University