Construction automation : data handling in BIM environment
As Building Information Modelling (BIM) takes precedence in the construction industry, we see that there is a gap between quantity take-off and BIM. Quantity take-off is vital during the early stages of the project due to the costs estimations. Quantity Surveyors (QS) are still verifying quantities...
Saved in:
Main Author: | Nurul Afifa Khairul Anwar |
---|---|
Other Authors: | Teoh Bak Koon |
Format: | Final Year Project |
Language: | English |
Published: |
Nanyang Technological University
2020
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/138445 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
BIM: automated quantity retrieval of expansion joints using revit & dynamo
by: Lim, Brendan Jie Kang
Published: (2022) -
The application of building information modelling (BIM) on construction productivity
by: Zhang, Cheng Long
Published: (2015) -
A BIM and construction productivity study on precast concrete installation
by: Sun, Jing Xiang
Published: (2015) -
A study on solutions to exchange the building projects data between BIM platforms
by: Kock, Ming Tai
Published: (2018) -
Construction productivity in Singapore using Obayashi's building automated construction system
by: Zhou, Ji.
Published: (2008)